Start with your existing agreement
Review the permitted uses, leased premises, access and utility easements, consent requirements, payment terms and remaining term. The proposed battery could fit within existing rights, require an amendment or involve additional land; the answer depends on the documents and proposal.
If you have a lender, co-owner, farm tenant or other party with rights in the property, ask your attorney which consents or coordination are needed.

Ask for a site-specific plan
Request a map showing battery equipment, fencing, access, electrical routes, drainage and any temporary work areas. Ask whether land outside the current lease is needed and how construction and maintenance would affect the land you retain.
Identify who will own, operate and maintain the equipment, what permits and utility approvals are needed, and whether the battery may charge from the grid. Ask for the status of studies and agreements rather than assuming the solar project's connection covers the change.
Discuss safety and end-of-term duties
Ask about emergency access, coordination with local responders, operating procedures and insurance. Requirements depend on the design and the authorities reviewing the project.
Review who removes battery equipment and restores the site, how removal costs are secured, when that security is funded and what happens if the project changes hands. Check that any existing decommissioning arrangement covers the proposed addition.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCompare the entire amendment
If new rights or a longer term are requested, consider compensation, payment timing, extension rights and restrictions on the rest of your property together. Ask what happens if approvals are not obtained or the battery is never built.
Have your own attorney and tax adviser review any amendment before signing. The existing agreement and the proposed changes determine the outcome.
Start a property conversation
Sunland reviews land inquiries nationwide. Share the location, current use, whether the property is already under a solar agreement and whether you would consider a sale or lease. An inquiry is not a commitment, and no project or payment is guaranteed.
Questions landowners ask
Does a solar lease automatically allow a battery?
Not necessarily. Review its permitted uses, boundaries and consent provisions with your attorney.
Can an existing solar connection be used for storage?
It may be possible, but the proposed configuration and interconnection terms require project-specific review. Existing service does not guarantee approval or capacity.
Can I offer additional land next to my solar lease?
You can describe the area and any existing rights. Access, permitting, electrical review and agreement terms still need to be resolved.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.