Start with the land you can make available
A data center houses computing and communications equipment in buildings with supporting electrical, cooling and security systems. Projects vary in size and layout. There is no single acreage threshold that establishes whether every property will work.
Share the property location, approximate acreage if known, and whether you are considering a sale, a lease or both. A parcel number or map can help locate land without a street address. Tell us if you want to keep using part of the property or if tenants, easements or other restrictions affect it.

Power must be confirmed for the actual project
Data centers can need substantial electricity. A nearby power line or substation is a useful clue, but it does not establish that enough power can be delivered to the property when a project needs it.
The serving utility and, where applicable, the grid operator would need to assess a proposed load. The review can identify available service, required equipment or network upgrades, cost and timing. These answers depend on the location and project; a map or a general regional capacity figure is not a commitment to serve the parcel.
If you know the utility or have existing service information, share it. You do not need to arrange or pay for a power study before making an inquiry.
Roads, fiber and the rest of the site
A project needs a practical way for construction vehicles and ongoing operations to reach the land. Describe existing driveways and public road access, and mention any access that crosses another owner’s property. Rights to improve or use a route may need to be established.
Data centers also need fiber: cables that carry digital information to and from networks. A provider must assess whether suitable connections can reach the site, what route and permissions are needed, and the cost and timing. A fiber line in the area does not by itself guarantee service to a parcel.
Usable ground, flood risk, drainage, water and wastewater needs, neighboring uses, zoning and permits can also affect a proposal. Requirements vary by design and location; no particular site is approved simply because it meets one criterion.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCompare the terms of a sale or lease
Ask for a map of the land and any access or utility rights a proposal would cover. For a sale, understand the price, conditions, investigation period and closing timeline. For a lease, ask when payments begin, how they change, how long the agreement lasts and who maintains and restores the site.
An option can give a prospective developer time to investigate before deciding whether to proceed. Ask about the payment, length, extension rights and what happens if the project does not move forward. Consider advice from your own legal and tax advisers before signing.
What happens after you contact us
Sunland reviews the information you send and may follow up for a map or additional details. If a property appears promising, further discussions and site-specific checks would be needed before any proposal. Some properties will not proceed because of power, access, local requirements, economics or other conditions.
Submitting the form does not reserve your land or commit you to a sale or lease.
Questions landowners ask
Do I need a power study before contacting Sunland?
No. Start with the location and what you know. Utility service, cost and timing require project-specific investigation later.
Does a nearby substation mean my land has enough power?
No. It can be relevant to a review, but the utility must assess the proposed load and the work required to serve it.
Can I offer only part of my property?
Yes. Describe the area you could make available and any access or ongoing uses you want to retain. A site layout and rights would need to be worked out for a specific proposal.
Can I explore both a sale and a lease?
Yes. You can tell us you are considering either or are still deciding. Sending your details does not commit you to an agreement.
What if I do not know whether fiber is nearby?
That is fine. A communications provider would need to evaluate a route and service for the site. Share any information you already have.