Arizona landowner guide

Can an Arizona recharge facility carve out land for solar?

A landowner may see open ground beside recharge basins or a managed stream channel and consider offering it for solar. That ground may also support water delivery, monitoring, maintenance or future operations. Before offering an option, identify the permitted facility and its operating needs, then test a proposed solar footprint against them.

Could my land work?

Obtain the current Arizona Department of Water Resources (ADWR) facility permit, amendments, plans and property agreements. Map the proposed solar work and access against recharge facilities, monitoring points and operational routes, and review the overlay with the facility permit holder and operator. Confirm the landowner’s authority and ask ADWR and other applicable agencies whether the particular change needs review or approval. Define any carve-out and reserved rights only after those questions are understood; land control alone does not transfer water rights or storage credits.

Identify the facility and the parties

ADWR distinguishes a constructed underground storage facility, which uses a constructed device such as a percolation basin or injection well, from a managed facility, which uses a natural stream channel and controlled releases. Establish which permit and boundaries apply to the site; a vacant-looking area or the projected underground area of impact is not itself a solar boundary. Request the current permit, amendments, approved plans, operating and monitoring conditions, and any pending applications from the permit holder and ADWR.

Identify the landowner, facility permit holder and actual operator, along with any easement holders and water storage customers. They may be different parties. An underground storage facility permit authorizes facility operation; a water storage permit is a separate authorization for a storer. A customer’s ability to store water does not by itself establish authority to lease the land. Review deeds, title exceptions, leases, operating agreements and access rights with Arizona counsel.

Illustration of a land parcel and surrounding landscape

Overlay the full solar footprint

On a current survey and facility plan, show the proposed panels, foundations, inverters, fencing, cable routes, drainage, roads, construction staging, equipment delivery and temporary disturbance. Compare them with basins and berms, channels and release points, injection and recovery wells where present, pipelines, meters, monitoring wells and sampling points. Include utility corridors and existing and planned access for operators, heavy equipment, inspection, maintenance and emergency response.

Walk the site with the operator and ask about water flow, flooding, sediment removal, basin drying and maintenance, monitoring, future expansion and seasonal operations. A managed channel may need space for flows and access even where no basin exists. Record setbacks and exclusions required by the actual permits or agreements and have qualified engineers assess drainage and interference; do not infer a universal solar setback from the facility boundary.

Check the proposed change with agencies

Arizona law requires an underground storage facility permit to operate a constructed or managed facility. Obtain the actual permit and ask ADWR’s Recharge Program whether the proposed carve-out, access changes or construction affect its conditions or require a modification. ADWR’s application guidance describes modification as potentially covering many permit changes. Do not assume a solar lease is automatically a permit modification or that it needs none: the outcome depends on the facility and proposal.

Ask the operator and relevant agencies about applicable water-quality permits and conditions, well requirements, floodplain and drainage approvals, local solar and grading approvals, and any utility or other third-party permissions. Provide an overlay and construction sequence so reviewers can assess the actual work. A preliminary conversation is useful, but retain written determinations and obtain required approvals before the affected work begins.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Define the carve-out before an option

If the parties identify a workable area, have counsel describe it on an exhibit tied to a survey, including solar access and cable routes and excluded recharge areas. Reserve the operator’s necessary access, maintenance, monitoring and emergency rights, and address gates, crossing standards, construction notice, scheduling and who coordinates interruptions. Specify who maintains shared roads and drainage, restores damage, carries insurance and resolves conflicts.

Make investigation rights and any option or lease conditional on resolving title, consent, engineering and applicable permit questions. Allocate responsibility, cost, deadlines and consequences if approvals or a workable layout cannot be obtained. Avoid promising exclusive possession or a construction date that conflicts with existing rights or facility operations. Review any future expansion commitments before treating unused land as available.

Keep water interests separate

A solar carve-out does not automatically convey a water supply, a water storage or facility permit, recovery rights or long-term storage credits. ADWR lists separate processes for permit conveyance and credit transfers. Identify who holds each relevant interest and have water counsel address any proposed change through the applicable process; do not include an assumed transfer in the land deal.

An owner or authorized representative can ask Sunland to screen Arizona land for a solar sale or lease. Share the location, approximate acreage, the facility type and known constraints. Provide permit and title records privately for review, and involve the operator and qualified advisers before committing the area.

Questions landowners ask

Can unused land inside a recharge facility be leased for solar?

Possibly, if the owner has authority and the layout, existing rights, operating needs and applicable approvals allow it. Review the specific permit and agreements with the operator and advisers first.

Does a water storage customer control the land?

Not necessarily. The landowner, facility permit holder, operator and water storage permit holder may be different parties. Check the relevant documents and authority.

Does leasing the land transfer stored water credits?

No automatic transfer should be assumed. Credits and permits have separate rules and processes; consult Arizona water counsel and ADWR about any proposed transfer.

Sources & further reading

Arizona statutes and ADWR guidance checked November 16, 2026 Pacific. Permit conditions and required approvals depend on the facility and proposed work. Local rules and program details can change. Check the requirements for the actual project.