Find the project record and the historic site
Collect the Part 1 significance record, approved Part 2 description and plans, all amendments and NPS decisions, and the Part 3 request and certification. Confirm the rehabilitation completion date, the owner and tax-credit parties, the buildings covered and any conditions. Part 2 describes the rehabilitation; Part 3 documents the completed work and its NPS approval certifies the rehabilitation. Compare the records with a survey, current ownership and the proposed battery lease area.
NPS review is not confined to the work that earned a credit or to a line on a tax parcel map. Its scope includes the building, site and environment and historically associated property under the same ownership, including historically functionally related buildings. National Register boundaries do not necessarily limit the review if historic property extends beyond them. A separate parcel, lease area or apparently vacant yard does not by itself settle whether the work affects the historic property; ask SHPO and NPS about the actual facts.

Show the entire battery proposal
Request a scaled plan showing battery units, concrete pads, transformers, fencing, lighting, roads, grading, drainage, utility connections, trenching and staging. Trace conduits from the yard to their connection point, including any wall penetrations. Include construction and maintenance access, temporary disturbance and future removal. Overlay the plan on the rehabilitation site plan and identify historic buildings, landscape features and important views.
Provide current photographs and proposed elevations, materials, equipment dimensions and installation methods. Explain which work was already described in the approved application and what is new. The Standards address the site and environment as well as related new construction; the impact of a yard depends on its location, design and effects on historic character, not simply whether the equipment is attached to the mill.
Consult SHPO and obtain a written NPS decision
Contact the SHPO early with the Part 3 decision, completion date and complete proposal. Ask whether the work falls within the certified project or related historic property and which amendment or advisory determination submission is appropriate. NPS guidance for historically functionally related complexes says work on the property during or within five years of an individual project’s completion must be submitted for NPS review, even if part of a separate project. Do not assume the proposed battery yard is outside review because it is a new use or has a different developer.
For a proposed or ongoing approved rehabilitation, 36 CFR 67.6(d) requires substantive changes to be brought promptly to the Secretary’s attention in writing through the SHPO. NPS application instructions provide an Amendment / Advisory Determination form; confirm the correct route for this completed project with the SHPO. The SHPO forwards applications with a recommendation, but NPS makes the federal certification decision. NPS approvals are written; a conversation or local approval is not a substitute. Secure the written determination before ground disturbance or other work.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landUnderstand the certification and tax risks
Under 36 CFR 67.6(e), the Secretary may inspect up to five years after rehabilitation completion and may revoke certification, after giving the owner 30 days to comment, if the project was not undertaken as represented or if the owner undertook further unapproved project work inconsistent with the Standards after certification. A proposal is not itself an automatic revocation or recapture. The Treasury determines tax consequences of revocation; ask tax counsel to assess the particular credit, ownership, transaction and timing before committing.
This review is separate from a recorded preservation easement or restriction. Obtain any such instrument and consult its holder about required consents; NPS tax-credit review does not replace those obligations. State credits, local historic district rules, permits, financing and other federal or state reviews may impose additional requirements or deadlines.
Make the site agreement workable
Before signing a binding commitment, test alternative pad locations, routes and screening with the developer and preservation advisers. Allocate preparation and review costs, agency communications, design revisions, access, restoration and compliance with written conditions. Set realistic review milestones and provide for delay, redesign or termination if required decisions cannot be obtained on acceptable terms. Coordinate with the rehabilitation owner and credit stakeholders if they differ from the proposed lessor.
Sunland welcomes battery storage land inquiries from owners and authorized representatives. Share the location, acreage, rehabilitation completion date and proposed site area; provide certification records and plans privately when needed.
Questions landowners ask
Does a battery yard automatically trigger recapture of the historic tax credit?
No. The NPS can revoke certification in the circumstances described in 36 CFR 67.6(e); Treasury determines the tax consequences. Obtain project-specific preservation and tax advice.
Does a separate parcel or a location outside the National Register boundary avoid review?
Not necessarily. The historic site and historically associated property may extend beyond those boundaries. Show the full proposal and ownership to SHPO and NPS.
Is SHPO approval enough?
The SHPO reviews and forwards applications, generally with a recommendation, but NPS makes the federal certification decision. Request the applicable NPS determination in writing and address any separate restriction-holder consent.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.