Landowner guide

Can a battery storage project use a closed coal ash unit?

A former coal combustion residuals (CCR), or coal ash, pond or landfill may look like open land after closure. If ash remains in place, the cover, groundwater monitoring and access for continuing care can shape where a battery storage project can be built. Owners should review the closure and care records before offering pad rights.

The short answer

Before granting pad rights, obtain the closure completion notice and its engineer certification or applicable regulator approval, current post-closure plan and deed notation or other recorded instrument. Compare the developer’s entire footprint with the cover, containment, monitoring and maintenance areas, then have the responsible owner or operator and qualified advisers evaluate the proposal and any agency process. Confirm which federal and state requirements apply to the particular unit; a closure label alone does not establish that a pad or trench is available.

Collect the closure and care records

Ask the unit owner or operator for the closure plan and completion notice and its engineer certification or applicable regulator approval, the current written post-closure plan and amendments, as-built drawings, cover and drainage details, monitoring well locations, maintenance records and any corrective action documents. Check the facility’s public CCR website and operating record for documents, and ask for missing or current materials. A plan to close is different from evidence that closure was completed.

Obtain the deed notation or other instrument normally examined in a title search and review it with counsel alongside the survey, title documents, permits and other restrictions. Under 40 CFR 257.102(i), subject to its stated exception, the owner or operator records a notation following closure that alerts a potential purchaser to the former use and applicable post-closure use restrictions. Do not treat the notation as a complete engineering map.

Identify who is responsible for post-closure care and who needs access. Under the federal rule, care generally lasts 30 years, with continued care in specified circumstances and groundwater corrective action obligations where applicable. Confirm the actual status and requirements rather than assuming that a date or a sale ends them.

Illustration of a land parcel and surrounding landscape

Compare the complete project footprint

Request a layout covering battery equipment, foundations, access roads, cable routes, trenches, drainage, fencing, staging and laydown, construction traffic, maintenance and eventual removal. Overlay it on surveyed unit boundaries, final cover and containment components, wells, leachate systems where present, drainage controls and the access needed to inspect, monitor and repair them.

Have a qualified engineer and the responsible unit owner or operator evaluate loading, settlement, erosion, runoff, penetrations and access. Consider moving equipment and routes outside sensitive areas. Ask the applicable state agency or EPA where it is the permitting authority what review, permit changes or other approvals are needed before committing land or disturbing the site.

Check the post-closure use standard

For a unit subject to 40 CFR 257.104, the written post-closure plan describes monitoring, maintenance and planned property uses. During the post-closure period, use must not disturb the integrity of the final cover, liners or other containment components or the function of monitoring systems unless necessary to comply with the CCR subpart. The rule also allows other disturbance if the owner or operator demonstrates that disturbance of the specified containment components, including removal of CCR, will not increase the potential threat to human health or the environment. That demonstration requires a qualified professional engineer’s certification or approval by the Participating State Director or EPA where EPA is the permitting authority, and notice to the State Director that it is in the operating record and on the public website.

Do not assume a certification for a plan or a conceptual project layout satisfies this separate demonstration. Ask the responsible party and advisers whether the proposed use triggers a demonstration, a plan amendment or other site-specific requirements, and complete the applicable process before authorizing work. State law, permits and recorded restrictions may impose additional conditions.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Make the agreement reflect continuing care

Have counsel address the permitted footprint, required reviews and approvals, access for monitoring and repairs, responsibility for damage, cost, insurance, removal and restoration. Preserve the responsible party’s ability to carry out post-closure care, and specify what happens if the design must change or the necessary process cannot be completed.

Sunland reviews battery storage land and existing project opportunities nationwide. Share the location, approximate acreage and known coal ash closure issue; provide records privately if requested.

Questions landowners ask

Can a battery pad be placed on the cover?

The answer depends on the design, site conditions and applicable requirements. Obtain the records and have the complete footprint evaluated before granting pad rights.

Does a deed notation show every restricted area?

No. Review it with the closure and post-closure records, surveyed boundaries, permits and other recorded restrictions.

Does post-closure care automatically end after 30 years?

No. Federal care generally lasts 30 years, but specified circumstances can require it to continue, and corrective action obligations may also apply. Verify the unit’s actual status.

Sources & further reading

40 CFR 257.102 and 257.104 and EPA coal ash rulemaking information checked November 16, 2026. This guide concerns a CCR unit subject to those federal provisions and closed with ash in place. Applicability, permits, state requirements and site-specific restrictions must be confirmed for the unit. Local rules and program details can change. Check the requirements for the actual project.