Landowner guide

Who owns the existing transformer on a proposed battery storage site?

A transformer inside a proposed battery storage boundary may belong to a utility, a previous operator or the landowner. Locate it on the plan and identify its owner before promising access, reuse or removal.

The short answer

Ask the utility and current or former site operator who owns and controls the equipment, then request its identification, operating and environmental records. Check available polychlorinated biphenyls (PCB) transformer registration records as one lead, not a complete inventory or a substitute for testing and professional review. Do not touch or move the equipment; agree on investigation and responsibility before the transaction proceeds.

Locate the equipment and establish ownership

Show the transformer, associated cables, access route and any fenced enclosure on a current site plan. Photograph labels from a safe public or authorized location without opening or approaching energized equipment. Record visible identification numbers and ask whether it remains in service.

Ask the serving utility and site operator for ownership and maintenance records. Review deeds, easements, service agreements and past sale documents with counsel. A transformer located on your parcel does not necessarily belong to you, and a boundary line alone does not establish the right to remove it.

Illustration of a land parcel and surrounding landscape

Check records without assuming the answer

Request the equipment inventory, nameplate information, inspection and maintenance records, fluid records, sampling results and any spill or cleanup correspondence. Ask an environmental professional to determine whether records identify the equipment and what additional investigation is appropriate. Age or appearance alone does not establish its PCB concentration.

EPA publishes a PCB transformer registration database with a most-recent registrations table by location. Use it as a lead and compare the location and equipment details with the owner’s records. A missing listing does not prove that a transformer is PCB-free, and a listing alone does not establish which unit remains on the property.

Federal regulations address registration of PCB Transformers and contain specific limitations and exceptions, including that a person taking possession after December 28, 1998 is not required to register or re-register the transformer under that provision. Match records to the actual unit and ask a qualified adviser which other requirements apply to the equipment and circumstances.

Decide what the proposal includes

Ask the battery developer whether the plan assumes the transformer will remain, be reused or be removed, and what evidence supports that assumption. Reuse requires separate electrical, ownership and project review; proximity to equipment does not establish interconnection capacity or approval.

If removal or investigation is proposed, identify the equipment owner, approvals, access rights, qualified contractors, schedule and costs before agreeing. Have counsel address allocation of responsibility and the treatment of known and unknown conditions in the actual agreement. Applicable handling, disposal and cleanup requirements depend on the equipment and facts.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Prepare for the next conversation

Keep the plan, identification details, utility correspondence, prior environmental reports and relevant agreements together. Ask who will obtain missing records and who can authorize inspection. If you see a leak or damage, keep people away and contact the equipment owner and appropriate authorities for guidance rather than handling it yourself.

Sunland reviews battery storage land and existing project agreements nationwide. An owner or authorized representative can submit the property location, approximate acreage and the known equipment issue; detailed records can be shared privately if requested.

Questions landowners ask

Does a transformer on my land belong to me?

Not necessarily. Ask the utility and operator and review the relevant property and service documents.

Does an absent EPA database entry mean the unit contains no PCBs?

No. The database is one lead; review equipment records and seek qualified advice about further investigation.

Can the battery project reuse the existing transformer?

That requires separate ownership, electrical and project review. The equipment’s presence does not establish capacity or approval.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Ask about your landTell us about your land