Find the right property and project records
Start with the deed, current survey, parcel numbers and a map of the proposed sale or lease. Gather historical military-use information, prior environmental assessments, title exceptions, notices, easements and any existing leases or agreements. Ask the local USACE district for the FUDS property name and number, each relevant project number and munitions response site (MRS) designation, the project manager and the latest status. A large former installation can contain several distinct study or response areas; a name on a map is a starting point, not a parcel-specific conclusion.
Request the actual preliminary assessment, site inspection, remedial investigation, decision document or record of decision, response and completion reports, and current land-use controls or notices, as applicable. Ask for maps, appendices and amendments as well as summaries. Identify what was investigated, when, by what methods, the boundaries and depths actually addressed, findings, exclusions, uncertainty and any remaining controls or future work. Ask for missing documents and written clarification where a report does not establish the parcel’s status. USACE’s FUDS GIS is a useful lead; confirm the property and its status with the responsible district.
A completed response does not guarantee every munition was found or that all future construction is appropriate. Surface work, a subsurface investigation and a response for a particular land use may have different limits. Have a qualified munitions specialist interpret the actual documents and identify gaps before the parties rely on a broad statement that the land was cleaned up.

Compare the records with the work you want to authorize
Overlay the survey and legal descriptions with study and response boundaries, known or suspected munitions areas, controls and access routes. Include battery equipment, foundations, grading, drainage, utility and interconnection corridors, roads, laydown areas and temporary construction access. A footprint outside one mapped area can still require review where the supporting records or site history leave uncertainty.
Give the specialist and USACE project manager a written description of each proposed activity, location, equipment and expected disturbance. Ask which records cover those areas and depths, whether controls or restrictions apply, what information is missing, and whether further investigation, approvals or munitions-qualified support are appropriate. Ask who determines the scope, who pays, and how changes to the layout or work will be reviewed. Do not authorize borings, trenching, test pits or other intrusive work until the parties have a site-specific plan and necessary permissions.
The Department of Defense says munitions can be encountered at the surface or below ground, including on land where a response has occurred. It notes that UXO-qualified personnel may be prudent or required for some construction work. The appropriate precautions and their cost depend on the site and proposed activity; a generic depth or a prior report cannot substitute for that determination.
Separate government access from developer testing rights
Obtain any existing USACE right-of-entry (ROE), amendments and correspondence. A USACE ROE gives the Corps and its contractors permission for specified government purposes; read its property description, permitted work, term, notice, restoration and termination provisions. Ask the project manager what access is currently needed, what work is planned, and how the proposed transaction and developer activities affect it. Do not assume a government investigation is scheduled or funded to meet a buyer’s deadline.
A developer’s option, lease or separate entry agreement is a different grant of rights. Specify the people and areas covered, permitted nonintrusive and intrusive activities, advance approvals, safety plan, insurance, damage and restoration obligations, handling of discoveries, reporting and stop-work authority. Reconcile these terms with government access, existing easements and land-use controls. Have counsel review them before signature, including any existing agreement already offered or signed.
Plan for a sale or partial conveyance: provide the agency with the proposed parcel description and ask what new access documentation it needs from the new owner. In a January 26, 2021 response for the former Mojave Gunnery Range C project, USACE stated that its ROE did not automatically transfer to a new owner and asked sellers to notify the project team of sales. That is a historical site-specific example; confirm the current documents and requirements for your property. A lease also needs coordination among the owner, tenant and agency.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAgree on transaction decisions and a discovery response
Before setting a closing or construction deadline, ask the buyer or tenant who orders and pays for records review, specialist work and any further investigation; what findings permit a layout change, extension or termination; and who receives reports. Address agency access, continuing controls, restoration, insurance and responsibility for unexpected conditions in the transaction documents. Counsel and the title insurer should review recorded restrictions and any rights affecting the land being conveyed or retained. No transaction structure by itself resolves the underlying hazard.
If anyone encounters or suspects a munition, stop intrusive work nearby, warn others, do not approach, touch, move or disturb it, and carefully leave the area. Keep others away and call 911 to report what was seen and where. Local authorities arrange the appropriate response. Do not attempt to identify, move or dispose of an object yourself.
Sunland reviews battery storage land opportunities in any U.S. state, including sales, leases and existing agreements. An owner or authorized representative can share the location, acreage, transaction objectives, known military history and available records privately. Sunland may contract for a parcel and assign its rights to a specialist, subject to the agreement. An initial discussion does not establish project feasibility or promise cleanup or funding.
Questions landowners ask
Does a FUDS designation prevent a sale or lease?
Not necessarily. The relevant records, existing rights and restrictions, proposed use and transaction terms need site-specific review. Ask USACE about the project and consult your own counsel and a qualified munitions specialist.
Can a developer start soil borings under an access agreement?
Only after the owner and developer have addressed the site-specific hazards, applicable restrictions, necessary permissions and a suitable work plan. A developer access grant does not substitute for a munitions review or government access agreement.
Does a prior cleanup mean all munitions are gone?
No. Review the actual response documents for the area, depths, methods, limits and any remaining controls. DoD advises that munitions may be encountered even where a response has occurred.
Does the Corps right of entry transfer automatically when I sell?
Do not assume it does. USACE said the ROE for its former Mojave Gunnery Range C project did not automatically transfer to a new owner in its 2021 project Q&A. Ask the responsible project team what documentation is needed for your transaction.
Who pays for additional investigation?
That depends on the work, program eligibility and the parties’ agreements. Ask the agency and the proposed buyer or tenant about scope, funding and timing; do not assume a government response will pay for developer diligence or occur on the transaction schedule.
Sources & further reading
USACE FUDS and Department of Defense explosives safety sources checked November 17, 2026. Site-specific records and agency advice are needed; the historical Mojave example describes a 2021 project response. Local rules and program details can change. Check the requirements for the actual project.