Identify the mark and its setting
A metal disk may be a geodetic control mark, a property boundary monument or another type of survey marker. The National Geodetic Survey (NGS) describes survey marks as permanent marks or disks with known latitude, longitude or height information. A geodetic mark does not by itself establish a parcel corner or property line; a boundary survey requires review of the relevant records and evidence.
Record visible lettering and numbers, take a clear photograph and note nearby features. Do not dig around the disk or disturb its setting. Ask a licensed surveyor to compare the mark with recorded surveys and any available control records, and to locate it accurately relative to the planned work.

Check the datasheet and responsible organization
For a mark in the NGS database, a permanent identifier (PID) can help locate its survey mark datasheet. NGS directs users who do not know a PID to its datasheets tool. Compare any record with the physical mark and location; a similar name or nearby map point alone is not proof of identity.
Ask the surveyor to identify the organization that set the mark and the appropriate party to contact. Marks may have different origins; an NGS record does not establish that NOAA owns every disk. The responsible organization can help explain applicable protection, notification or replacement procedures.
Protect it during design and construction
Provide the developer and construction team the surveyed location and ask whether the pad, trench, road, grading and equipment movements can avoid it. Have the surveyor and responsible organization advise on a protective area and field controls appropriate to the actual mark and work. Show those controls on plans and communicate them to contractors.
If avoidance is not feasible, obtain guidance from the responsible organization and surveyor before work on any authorized relocation or replacement. NGS notes that damage can compromise positional information and a removed mark is no longer useful. An ordinary construction reset is not automatically a substitute for the original control.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landBring the issue into the property discussion
Keep photos, available datasheets, surveyor findings and correspondence with the site records. Ask the developer who will coordinate protection, pay for professional work, revise the layout and manage construction access. Counsel can review the proposed option, sale or lease, including investigation rights and assignment provisions.
Sunland reviews battery storage opportunities throughout the United States, including land for sale or lease and existing project agreements. An owner or authorized representative can share the location, approximate acreage, relationship to the property and the known mark; provide detailed records privately if requested.
Questions landowners ask
Does a survey disk mark my property corner?
Not necessarily. A licensed surveyor can identify the mark and examine boundary evidence and records.
Can a contractor move the disk out of the way?
Preserve it in place and seek guidance from the surveyor and responsible organization before any work that may disturb it.
What if I cannot find a PID?
Give the surveyor the visible stamping, photographs and location. NGS provides a datasheets tool for identifying marks in its database, but not every disk will necessarily appear there.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.