Landowner guide

What happens to an existing antenna tower on battery storage land?

An existing communications tower can remain important to its owner and tenants after a battery storage transaction. Start by identifying the structure, the land interests and the service routes before drawing a battery fence or agreeing what will transfer.

The short answer

Find the tower registration number, obtain the FCC Antenna Structure Registration record and compare it with the deed, tower lease and tenant agreements. Map the tower footprint, equipment, utilities and access. Ask the parties and their advisers whether the tower stays under existing ownership or is separately conveyed, and document the result.

Identify the structure and the rights

Locate the registration number and retrieve the FCC Antenna Structure Registration (ASR) record for the structure, if registered. Compare the registered owner and location with the actual tower and available agreements. Registration is an important lead; it does not by itself establish who owns the land, the tower, attached equipment or a tenant interest. Ask the parties and title counsel to reconcile any differences.

Collect the deed, survey, tower lease and amendments, easements, tenant agreements and utility records. Determine who may enter, maintain equipment and use power or communications lines, including any emergency access. Confirm which rights survive a sale or lease and which consents or notices the actual agreements require.

Illustration of a land parcel and surrounding landscape

Design around continued tower service

Put the tower base, guy anchors if present, equipment cabinets, buried lines and existing service route on a current site plan. Compare them with the proposed battery containers, fencing, gates, construction traffic and utility work. Ask tower representatives and the battery developer how routine maintenance, heavy equipment, emergency response and future replacement will work.

If the tower remains with its present owner, ask counsel to document the reserved footprint, access route, gate arrangements and utility rights consistent with existing agreements. If a different route or temporary interruption is proposed, agree it with the parties holding the relevant rights before construction. An FCC registration does not itself allocate those private access rights.

Plan a separate structure transfer if contemplated

A sale of land does not answer by itself whether the tower and associated contracts are included. Have the purchase documents and closing checklist identify the structure, equipment, leases and obligations being retained or conveyed, and address required consents, records and handoff. Confirm how ongoing inspection, lighting and maintenance responsibilities will be handled with communications counsel.

For a structure with an ASR number, 47 CFR 17.57 requires the owner to notify the FCC within five days of a change in ownership information using Form 854. FCC instructions describe an ownership-change process involving the current and new owners. Coordinate the filing and handoff early, verify current instructions, and keep confirmation with the closing records. A land-only transaction may not change structure ownership; verify the facts before deciding what filing is needed.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Bring the question to screening

Sunland reviews battery storage properties and existing project agreements nationwide. An owner or authorized representative can submit land for sale or lease or identify existing rights for review. Share the location, approximate acreage and the presence of a tower; provide agreements and detailed plans privately if requested.

Questions landowners ask

Does an ASR record prove who owns the land?

No. Compare the registration with the deed, tower and tenant agreements and title evidence.

Must the tower be sold with the land?

The parties must establish the existing ownership and rights and document the transaction. A tower may be retained or separately conveyed subject to its agreements.

Who files an ownership change?

For a registered structure, the owner must notify the FCC of a change in ownership information within five days using Form 854. Coordinate with the current and new owners and communications counsel under the current FCC process.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Ask about your landTell us about your land