Check which land the clause covers
A proposed battery storage lease in a Frederick County, Maryland, board packet illustrates the difference. The proposal defines the overall property separately from the battery premises and easement areas. Its drone provision, section 3.1.12, refers to flights over the defined property and to audio and video for defined operations. Other access provisions use narrower descriptions. Have counsel reconcile those descriptions in your own agreement before relying on the fence or lease boundary.
Have the tenant draw the premises, easement corridors and retained land on one exhibit. Mark the home, farm work areas and occupied buildings where a flight or recording could affect people using the property. Ask for the expected flight area, launch and landing points and ground access. Identify any exceptions that need advance notice, permission or an emergency contact.

Specify what can be recorded and who can use it
Ask for examples of the inspections that require imagery and whether the equipment can collect audio. Describe the permitted purposes and the areas that should be excluded or masked when practical. Address any proposed training, publication, promotion or sharing with outside parties in the lease or a referenced policy. Agree who will respond to incidental capture and when recordings need to be retained for an incident, insurer or legal requirement.
Ask who can see raw footage, how long the tenant and its contractors may keep copies, and who handles a request to restrict or delete material. If a confidentiality clause does not expressly cover recordings and derivative material, ask counsel to address them alongside any necessary disclosure exceptions. Tell the tenant about any existing farm or residential tenancy so the relevant rights and responsibilities can be reviewed.
Plan for different operators and transfers
Name the tenant contact responsible for contractor compliance and complaints. Ask how replacement contractors receive the current exhibit and restrictions, and whether the tenant remains responsible for their conduct. At assignment or termination, specify which recordings and operating records may transfer, what the former operator can retain, and who can confirm disposal of other copies.
Review private permission separately from applicable aviation and privacy requirements. FAA materials distinguish federal aviation safety and airspace regulation from issues involving ground launch or landing access and state or local privacy or trespass law, subject to federal preemption. Ask the tenant how it verifies applicable flight requirements. Have local counsel review the specific recording and access terms.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landBring the proposed clause to a property review
Bring the current lease and the definitions and plan it references, plus a description of the retained uses you need to protect. Sunland accepts battery storage sale, lease and existing agreement inquiries from owners and authorized representatives across the United States. Share the approximate property location and the scope of the proposed rights. Keep private recordings, tenant information and unredacted agreements for a later confidential review.
Questions landowners ask
Does a battery project fence show where the tenant can record?
Check the actual aircraft and recording clause, its referenced definitions and any limits in the exhibits. A project fence by itself does not establish the agreed area.
Does a lease signature give a contractor flight authorization?
The lease addresses private permissions. The contractor is responsible for applicable aviation requirements, and other laws can govern access and recording.
Sources & further reading
Sources checked November 19, 2026. The Frederick County packet supplies example proposal language. The signed agreement and applicable laws govern any actual site. Local rules and program details can change. Check the requirements for the actual project.