Obtain the available source water information
EPA describes a source water protection area as the land area contributing water to a drinking water supply where contamination may threaten the source. Delineation differs for groundwater and surface water and depends on local conditions. A simple radius drawn around a property is not a substitute for the applicable delineation.
Ask the public water system for an available delineated area and source water assessment or appropriate public summary, its date and whom to contact about newer information. EPA notes that assessments often identify the protection area, potential contaminant sources and susceptibility. State drinking water agencies may also provide assessment reports or respond to requests; the annual consumer confidence report may summarize the assessment.

Compare complete footprints, not just equipment pads
Ask the developer for a map of each alternative showing property lines, equipment, access roads, grading, drainage, utility routes and construction staging. Share the level of detail appropriate with the water system and planner. Ask whether the proposed work overlaps a mapped area or a zone of concern and whether more current information is available.
An assessment is information for protection planning, not a project permit. Do not assume that being inside an area automatically forbids storage, or that being outside one resolves all water or permitting questions.
Check the adopted rules and review process
EPA identifies local ordinances limiting certain activities in source water or wellhead protection areas as one possible protection measure. Ask the planning office for the adopted ordinance and overlay map, whether they apply to either layout, how battery storage is classified and which specific standards or approvals apply. State, local or other requirements may also apply.
Ask the developer and qualified site professionals to explain equipment, drainage, spill prevention, emergency response and construction measures to the relevant reviewers. Whether a measure satisfies a requirement depends on the proposal and the responsible authority’s review; a generic mitigation plan does not establish approval.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landChoose a path with the owner’s rights in mind
Compare the alternatives’ land requirements, access, review steps, cost and schedule. Before signing an option or lease, ask who pays for studies and applications, whether a changed layout needs your consent and what happens if a required approval is denied. Have counsel review the actual agreement and exhibits.
Sunland welcomes battery storage land and existing project inquiries nationwide. Share the location, approximate acreage if known, your relationship to the property and the competing layouts. Provide available maps privately if requested.
Questions landowners ask
Does a source water protection area prohibit batteries everywhere?
No universal answer follows from the area alone. Ask the responsible planner for the adopted rules and their application to the specific proposal.
Is a source water assessment a permit?
No. An assessment provides information about the source area and potential contamination. Ask the relevant agencies what project reviews and approvals apply.
Where can I find assessment information?
Ask the public water system or state drinking water agency for the assessment or an available summary and its date. EPA also notes that a consumer confidence report may contain a summary.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.