Landowner guide

Can a public housing authority ground lease unused land for battery storage?

A public housing authority (PHA) may see unused land near electrical infrastructure as a possible source of lease revenue. Before promising a battery storage developer long-term possession, the board should establish how the land is held, how residents and the development use it, and which HUD process applies.

The short answer

Compare the proposed lease area with the PHA’s annual contributions contract (ACC), declaration of trust or other recorded restrictions, and public housing inventory. A long commercial ground lease of covered public housing land may be a disposition requiring HUD approval under Section 18; exceptions depend on the property, purpose and term. Consult the HUD field office, Special Applications Center (SAC) and counsel before granting possession or committing to an unconditional closing.

Establish what the authority owns and how it is restricted

Obtain the deed, survey, title report, ACC and amendments, declaration of trust or restrictive covenants, inventory records, development plans and relevant HUD correspondence. Compare the proposed leased area with the public housing development’s boundaries and the land included in those documents. Vacant land may still support parking, utilities, stormwater, resident access or future housing, and an apparently unused parcel is not automatically free of federal restrictions.

Map the battery enclosure, construction staging, equipment deliveries, buried lines, utility easements and emergency access. Identify potential effects on residents and on the remaining development. If the land is held outside the ACC or under another federal program, ask counsel and HUD which restrictions and approval process apply rather than assuming Section 18 applies or does not apply.

Illustration of a land parcel and surrounding landscape

Test the purpose and term of the lease

Under 24 CFR 970.5, disposition includes transferring any interest in public housing development real estate, subject to the exceptions in section 970.3. Part 970 applies to PHA-owned public housing developments subject to an ACC. Its exceptions include certain space leased incidentally to normal public housing operations and units or land leased for non-dwelling purposes for one year or less. Those exceptions should be evaluated on the actual agreement and use, not just its label.

HUD Notice PIH 2026-23 states that a ground lease, air rights lease or easement with a term over one year requires a disposition application if it does not qualify for a section 970.3(b) exception. A long commercial battery ground lease should therefore be reviewed with the field office and SAC before possession. Retaining title does not by itself eliminate the need for HUD review. Even if a Part 970 exception applies, ask the field office whether ACC or other approval is required.

Develop the disposition case and consult residents

For non-dwelling property or vacant land, 24 CFR 970.17(d) provides criteria including land exceeding development needs after the date of full availability, or a disposition that is incidental to or does not interfere with continued operation of the remaining development. HUD’s SAC guidance says PHAs should use one of these justifications and support it with a narrative and documentation. A battery proposal is not automatically eligible simply because the land appears vacant.

Coordinate required resident and local government consultation, the board resolution and environmental review with HUD and counsel. The current notice addresses these and other application requirements, including valuation and proposed use of proceeds. HUD’s notice treats a lease as a negotiated disposition and calls for the application to describe the lease terms, payments and proposed lessee’s legal entity. Do not assume a board vote alone grants federal approval or that revenue may be spent without applicable restrictions.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Make possession and construction conditional

Have counsel structure any developer agreement around the required HUD decision and conditions, environmental clearance and other applicable approvals. Define the land and access being offered, permitted pre-approval activities, lease term and extensions, rent and valuation, utility rights, safety responsibilities, insurance, removal and restoration, and who pays for studies. Address what happens if approval is denied, delayed or conditioned. Confirm with HUD before allowing any activity that could compromise the required review.

Coordinate local permitting, electrical interconnection and emergency response with the developer while protecting resident access and the development’s operations. Sunland reviews battery storage land opportunities nationwide. An authorized PHA representative can share the location, approximate acreage and known federal property status; provide sensitive records privately if requested.

Questions landowners ask

Does keeping ownership avoid HUD disposition review?

Not necessarily. A ground lease transfers an interest in real estate. For covered public housing property, the term, purpose and exceptions must be evaluated under Part 970 and applicable HUD guidance.

Does a vacant parcel automatically qualify?

No. Document its status and the effect on the development. HUD requires an applicable justification and other application requirements for a Section 18 disposition.

Can the board authorize possession immediately?

A board resolution does not replace required HUD approval or environmental clearance. Confirm the applicable process and permissible preliminary activities with HUD and counsel before handing over land.

Sources & further reading

HUD PIH Notice 2026-23 and 24 CFR part 970 checked November 16, 2026. HUD identifies Notice 2026-23 as superseding PIH 2024-40. Confirm current guidance and the facts of the specific property with HUD. Local rules and program details can change. Check the requirements for the actual project.