Landowner guide

Can a battery storage project share land near a regulatory air monitor?

A battery storage proposal near an ambient-air monitoring station raises two separate questions: what rights does the monitoring operator already have, and would the proposed construction or permanent layout affect the station’s ability to collect representative data? A station marker alone will not answer either question. Identify the monitor and have the operator review the actual footprint before committing possession.

The short answer

Identify the station and operating agency, obtain the existing access and property documents, and overlay the proposed battery facility and temporary work on a dated site plan. Ask the monitoring agency to assess access, obstructions and other siting effects and identify the process for any change. Use the response and legal review of existing rights to negotiate an option or lease that makes possession and construction conditional on a workable arrangement and any required approvals.

Identify the station and the rights that apply

EPA Region 4 serves Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina and Tennessee. Ask the state, local or other operating agency for the station name and Air Quality System (AQS) site ID, pollutants, monitoring purpose and designation. Locate it in the agency’s current annual monitoring network plan and any approved amendments. A single site can contain several monitors with different purposes; do not assume every outdoor sensor is a State and Local Air Monitoring Station (SLAMS).

A privately operated sensor or a special purpose monitor may have a different purpose and regulatory treatment. Section 58.11 makes the Appendix E siting criteria mandatory for SLAMS stations and optional for special purpose monitoring stations; an ordinary private sensor is not automatically SLAMS. Still check the actual agreements, permit conditions and operator’s needs for any installation. Classification and ownership cannot be settled from a map pin alone.

Collect the owner’s station license, lease or access agreement, amendments, site plan and applicable recorded easements or other title documents. Identify who can enter, maintain equipment and utilities, and terminate or change the arrangement. The monitoring network plan is evidence of the monitoring program; it does not by itself grant the battery developer possession or resolve private property rights.

Illustration of a land parcel and surrounding landscape

Compare the complete battery footprint with the monitoring site

Put proposed battery enclosures, inverters, transformers, substation, roads, gates, fences, drainage, grading, lighting and underground cables on a dated plan together with temporary laydown areas, cranes, dust controls and construction traffic. Map the monitor shelter, inlet or probe, power, communications and operator access, including parking and emergency maintenance. Show existing and proposed heights and distances; ask the operator to verify what is needed rather than treating a mapped point as the full site.

Ask the agency whether buildings, fencing, vegetation, exhaust, dust or traffic associated with construction and operations could affect airflow, clearance or representativeness for the particular pollutants and monitoring objective. Part 58 Appendix D addresses network design and monitoring objectives; Appendix E addresses probe and monitoring-path siting. Applicable criteria depend on the monitor and site, so there is no universal battery setback to infer from this guidance. Consider alternative layouts, work sequencing and access protections with the agency.

Let the monitoring agency evaluate any change

Send the agency the site ID, proposed drawings and phases and ask for a written evaluation of continued access and siting, the information it needs, and whether it will consult EPA Region 4. Do this before signing away possession or allowing work. A technical discussion or preliminary option does not authorize moving, shutting down or modifying the station. The owner and developer cannot promise a replacement site or waive monitoring criteria themselves.

For SLAMS, 40 CFR 58.10 requires annual network plans and public inspection and comment; the plan identifies proposed station moves or removals within 18 months. Section 58.11 makes final SLAMS network design and changes subject to Regional Administrator approval, with additional Administrator approval for NCore and STN design changes. Section 58.14 addresses network changes and discontinuations. The monitoring agency develops and submits a proposal; EPA makes the applicable regulatory approval decision. Ask the agency which process applies to this particular change and whether additional approvals are needed.

Region 4’s 2016 policy describes documentation in an annual plan or addendum and public notice for changes outside the plan. It is historical guidance, not a land-use approval or a substitute for the current rules. Its 2018 waiver guidance refers to former Appendix E section 10. Current Appendix E section 4 addresses waivers, including a written request by the monitoring agency; ask Region 4 about current procedures. Neither historical document guarantees relocation or a waiver.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Make the site-control decision match the evidence

Have counsel compare the project documents with the monitoring agreement and title. A limited, revocable investigation license or negotiated option can allow planning while preserving the station; define entry, notice, insurance, restoration and expiration as appropriate. Do not assume a developer’s request for site control requires immediate exclusive possession or permission to build.

If the parties proceed, describe the actual project and work limits, reserved access and utilities, operator notice and emergency entry, and protections during construction and operations. Make possession and construction conditional on resolving existing rights, a workable layout and required approvals; allocate costs, schedule, delay and termination if the arrangement cannot be achieved. A technical response does not itself amend an existing agreement or grant the developer rights.

Sunland reviews battery storage land opportunities nationwide. An authorized owner or representative can share the approximate location, acreage, proposed layout and known monitoring issue. The site ID, access agreement and agency response can be shared privately as appropriate. An initial discussion does not establish project feasibility.

Questions landowners ask

Does an air monitor automatically prevent a battery project?

No. The answer depends on the station’s designation, existing property rights, the project layout and the operating agency’s assessment. Obtain any applicable approvals before work.

Can the developer move the monitor?

Do not move or alter it on a developer’s assumption. For a SLAMS change, the monitoring agency evaluates and submits a proposal and EPA decides applicable approvals. Special purpose monitor changes have different treatment under section 58.11(c); redesignating SLAMS as special purpose requires Regional Administrator approval. Property rights and a suitable location must also be resolved.

Is a private air sensor automatically a SLAMS station?

No. Identify the operator and designation. Even if it is not SLAMS, its agreement or other conditions may still matter to the land and project.

Sources & further reading

40 CFR Part 58 and EPA Region 4 historical monitoring guidance checked November 16, 2026 Pacific. Confirm the station designation and current regional procedures with the operating agency and EPA. Local rules and program details can change. Check the requirements for the actual project.