Landowner guide

Can waterfront land with a private navigation aid be sold or leased for battery storage?

A waterfront parcel offered for battery energy storage may contain a private navigation aid, or land and facilities essential to one nearby. A sale, lease or assignment can change access to the aid, its power supply or the people responsible for it. Identify those connections before a battery developer takes possession or construction begins.

The short answer

Locate the Coast Guard authorization and ask the Coast Guard district responsible for the aid how the proposed transaction affects it. If a district-authorized private aid, or its associated essential real estate or facility, is sold or transferred, 33 CFR 66.01-55 requires both parties to apply for authority to transfer maintenance responsibility. A lease or assignment does not automatically establish that this rule applies: describe the actual rights and proposed roles to the district. Preserve maintenance access, power and visibility while the parties resolve the arrangement.

Identify the aid and its relationship to the property

A private aid to navigation can be a light, daybeacon, buoy or other authorized marker. Find the district authorization and identify the aid, its class, location and approved characteristics. Confirm who owns the aid, who is responsible for maintaining it and whether the land or facility being offered is essential to it. An aid outside the proposed battery footprint can still depend on access or utilities crossing that footprint.

Collect the aid identification and coordinates, authorization and any amendments, diagrams, maintenance and outage history, power source and service arrangements. Compare these with a scaled plan of the battery equipment, fencing, roads, cable routes, grading, staging and construction access. Check the view from the water as well as physical access on land. Ask the responsible district to confirm the aid class and discuss uncertainties in the records.

Illustration of a land parcel and surrounding landscape

Determine whether maintenance responsibility will transfer

Under 33 CFR 66.01-55, when a district-authorized private aid, or the essential real estate or facility associated with it, is sold or transferred, both parties must submit applications to the district commander requesting authority to transfer maintenance responsibility. The relinquishing party indicates discontinuance and change of ownership on CG-2554; the accepting party indicates establishment and change of ownership. Follow the district’s instructions for the transaction and obtain its decision before treating the transfer as complete.

A lease, easement or assignment can take many forms. Do not assume that every lease or assignment changes aid ownership or triggers the transfer provision, or that a contract alone changes regulatory responsibility. Give the district the facts, including who retains the aid and essential land, who controls access and who will maintain and pay for it. Section 66.01-1 requires prior permission for the actions it covers, including changing or transferring ownership of an aid; section 66.01-5 identifies the application procedure and CG-2554.

Keep the aid operating through the handover

All classes of private aids must be maintained in proper operating condition and are subject to Coast Guard inspection. Agree who will inspect, maintain and repair the aid at every stage, including before closing, during construction and after possession. Identify contacts for faults and outages, the response process, costs and a practical route for personnel and equipment. Document access rights across retained or leased land and any gate or scheduling arrangements.

Trace the power source, meter, cables and backup arrangements. A battery project’s electrical work, excavation or fence could interrupt power or access even if the aid itself stays in place. Protect the aid’s visibility and authorized characteristics when planning equipment, lighting, cranes and temporary storage. If interference or obstruction occurs, 33 CFR 66.01-50 says a prompt report with available evidence should be made to the district commander. Coordinate the response with the district and the person responsible for the aid.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Do not assume the aid can simply be removed

The district assigns the aid’s class. A Class I aid is on a marine structure or other work whose owner is legally obligated to establish, maintain and operate it. District commander permission is required before changing, moving or discontinuing an authorized Class I aid required by statute or regulation. For authorized Class II and III aids not required by statute or regulation, the owner may discontinue and remove the aid after 30 days’ notice to the district commander to whom the original establishment request was submitted. Confirm the classification and procedure with the district before acting.

If the new owner of essential real estate or a facility refuses responsibility for the aid, section 66.01-55 generally requires the former owner to remove it without expense to the United States. The rule makes an exception for a required Class I aid: the new owner must maintain it until the conditions that made it necessary have been eliminated. Do not treat refusal as permission for an immediate removal or assume the exception applies without confirming the facts. Any proposed relocation or new fixed structure may also need separate review; before a fixed aid structure is placed in navigable waters, section 66.01-30 requires authorization from the applicable U.S. Army Corps of Engineers district.

Make the property agreement match the approved arrangement

Have counsel address the Coast Guard process, responsibility for applications and costs, timing and conditions to closing or possession, and what happens if authority or another necessary approval is unavailable. Record the actual access, power, maintenance and visibility protections, including construction-phase controls and arrangements after an assignment. A Coast Guard authorization does not itself grant private property rights or replace other applicable permits.

Sunland welcomes nationwide inquiries about land sales, leases and existing agreements. Share the property location, ownership, proposed transaction, approximate battery footprint and the known aid and its authorization. Sunland may contract for a parcel and then assign its interest to a specialist developer; discuss the proposed assignment, required consents and continuing aid obligations before signing.

Questions landowners ask

Does a battery lease automatically transfer responsibility for a navigation aid?

No. The effect depends on the rights and assets involved. Describe the proposed lease and maintenance arrangement to the Coast Guard district and ask whether an application is required.

Who applies if the aid or associated essential property is sold or transferred?

Section 66.01-55 requires both parties to apply to the responsible district for authority to transfer maintenance responsibility. The relinquishing and accepting parties make different indications on CG-2554.

Can the aid be removed to make room for batteries?

Do not assume so. Class I and Class II or III aids have different permission and notice provisions. Confirm the class and the proposed action with the district before moving or removing an aid.

What should the site plan show?

Show the aid and its power and access routes alongside the proposed battery equipment, fences, construction and staging areas. Assess whether permanent or temporary work could obstruct the aid or interrupt maintenance.

Sources & further reading

Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.