Find the local decision and the land it covers
Colorado’s 2026 law lets a local permitting entity designate eligible sites within its jurisdiction for projects such as solar. The entity is the local governing body or a local agency with land-use permitting authority. Ask the city, town or county which body is handling the designation and whether the area is proposed or already designated.
The law provides for public site eligibility documentation and consultation with Colorado Parks and Wildlife. It provides a hearing route that includes a designation hearing and hearings on applications for required construction permits, or designation through a qualifying new or substantially modified urban renewal or county revitalization plan. It also addresses community outreach and separately requires tribal consultation in specified areas. Ask for the applicable public record and any adopted plan or boundary exhibit.

Match the documented site to the solar layout
The statute specifies site categories, including brownfields as defined by Colorado law, affected mining land, closed landfills and land in specified cleanup programs. For land affected by oil and gas operations, all oil and gas infrastructure must be decommissioned and the site must be eligible for final reclamation as determined by the director of the Colorado Energy and Carbon Management Commission.
Compare the official boundary with the land exhibit and proposed panels, access, cables and staging. For example, a former industrial parcel might include both land documented for designation and adjacent acreage proposed for a new entrance. Ask the local entity which acreage the designation covers and the developer which permissions and approvals it needs for the remaining work.
Check project approvals and funding separately
Identify the construction permits and environmental approvals for the proposed work. Colorado’s designation law preserves applicable federal and state environmental limits, including rules governing brownfield cleanup and reuse. Compare the current proposal with cleanup documents, land-use restrictions and access needed for monitoring.
If the proposal relies on tax increment financing, ask for the approved urban renewal or county revitalization plan or modification. A plan that includes a reinvestment area must include a boundary map and describe the projects and costs to be financed or reimbursed. Ask the relevant authority which funding action it has taken and which conditions remain before the developer can use it.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDecide what the agreement needs before the next deadline
Have counsel identify which documents the sale, lease or option actually requires and when. If the parties want a designation, project approval or funding action before closing or site work, specify the record, who provides and reviews it, and what happens if the boundary changes or the decision is late. Review the signed notice and extension terms before agreeing to a new date.
Sunland welcomes nationwide inquiries from owners and authorized representatives about solar land sales, leases and assignments of existing agreements. Share the general location, your role and whether a designation is proposed or adopted. Keep signed agreements, surveys and detailed cleanup records for private review.
Questions landowners ask
Does previously disturbed land qualify for designation?
Ask the local permitting entity which statutory category it is evaluating and for the public documentation supporting that category for the site. Confirm separately whether the entity has made the designation.
Where can I confirm whether the whole lease area is included?
Start with the official designation boundary and any map in the adopted plan. Compare it with your lease exhibit and the developer’s full layout, including access and temporary work.
How can I tell whether the developer has public financing?
Ask the authority for the adopted plan, the project and costs it identifies, and any applicable financing authorization or agreement. Ask how the timing and conditions affect the developer’s proposal before changing your terms.
Sources & further reading
Colorado’s enacted law and the August 12, 2026 effective date were checked November 21, 2026. The former industrial parcel is hypothetical. Obtain the applicable local decisions and project records for your land. Local rules and program details can change. Check the requirements for the actual project.