Start with a location and a clear legend
Use a parcel map or aerial image and label the county, state, parcel identifier if known, date, approximate scale and north direction. Mark which lines are approximate. Add the land you would consider and areas you want to keep in their current use.
A parcel viewer can help identify a property, but check the deed and survey for legal boundaries. A screen map cannot settle a boundary dispute.

Mark what a visitor cannot infer
Add field gates, roads, buildings, wells, irrigation, drains, ditches, steep ground, wet areas, fences and tenant uses. Trace known access and utility easements from available documents, labeling them approximate. Note seasonal restrictions and sensitive places you do not want disturbed.
Ask the proponent to show panels or storage equipment, fencing, setbacks, staging, roads and cable routes on a separate overlay. Include access outside the proposed project area and how the retained land would be reached.
Use public layers as screening tools
USDA NRCS Web Soil Survey lets you define an area of interest and view soil information. FEMA’s Map Service Center provides official flood hazard information for the National Flood Insurance Program. Record the source and date for each layer, and ask local specialists about limitations, drainage and site conditions.
A mapped flood boundary is not a complete assessment of all flood risk. Soil maps and aerial images also cannot replace a site visit or professional investigation.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landKeep the grid question open
Mark visible lines and substations only as observations. DOE identifies interconnection costs, transmission access, topography, zoning and environmental impacts among siting considerations. A nearby line does not establish available capacity, a connection point or project cost; those require utility and project-specific review.
Use the map to ask better questions
Ask which areas may be needed temporarily or permanently, what studies are planned, who can enter and when, and how a revised layout changes the rights requested. Share the map with your attorney before agreeing to boundaries or easements.
Sunland reviews property information directly and may follow up. Sunland may contract for a property and assign the agreement to a specialist. Submitting a map is not a commitment or guarantee of a project.
Questions landowners ask
Do I need a professional survey before an inquiry?
No. An approximate map can start a discussion. A survey or legal description may be needed later to define rights and boundaries.
Does a nearby power line mean my property can connect?
No. Available capacity, costs and the point of connection require further review.
Can I map only the part I would consider?
Yes. Also show access and the surrounding uses that a project might affect.