Compare the field with the plan
Ask who will survey the property, when the survey will occur and whether it covers the entrance, access routes, proposed solar footprint and temporary staging areas. A drawing of panels alone does not show everywhere equipment might travel or vegetation might be cleared.
Request the survey results and a dated map that overlays identified burrows with the current work plan. Ask the survey professional to explain any limits, including areas they could not inspect. If the layout, route or timing changes, ask whether the field information and avoidance plan need to be updated before entry.
If you know of a burrow or see a possible one that is missing from the plan, tell the project contact and keep work away from that area while it is assessed. Do not assume an unmarked opening is abandoned or that a plan alone establishes conditions on the ground.

Understand what 25 feet means for the proposed work
FWC says a disturbance includes any type of work within 25 feet of a gopher tortoise burrow. Its permit guidance says a permit may not be needed when all development activity avoids burrows and tortoises by at least 25 feet. The examples include vegetation clearing, grading, construction and heavy equipment staging. The distance is a development-activity avoidance measure, not a blanket permission to harm a tortoise or burrow elsewhere.
Ask the survey professional to show the separation on the actual work map and explain how the team will keep vehicles, equipment and clearing outside the protected area. FWC says temporary exclusion fencing should protect burrows not directly impacted and keep tortoises out of construction areas, whether or not a permit is required. Ask the qualified team to plan any fencing in accordance with current guidance.
A burrow on neighboring land can matter too. FWC notes that work on your property within 25 feet of an adjacent burrow can result in responsibility if the burrow collapses or the tortoise is harmed. Contact the regional FWC gopher tortoise biologist for direction if nearby work could affect it.
Get a clear avoidance or permit plan before work
Ask whether the project can avoid all identified burrows and tortoises, including during early clearing, survey access and staging. If not, ask the developer and its qualified consultant which FWC authorization is needed, who will obtain it and what must happen before the affected work begins.
FWC states that a permit is required when a potentially occupied burrow will be disturbed or otherwise damaged. A permit application or a promise to apply is not the same as an issued permit. Ask for the permit and applicable conditions, the work area they cover and confirmation that required steps have been completed before allowing affected activities.
Do not move or handle a tortoise, disturb a burrow or direct a contractor to do so. FWC identifies authorized gopher tortoise agents through its permit locator and issues permits for authorized work. Contact FWC with questions about a particular site.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAssign responsibilities in the access request
Ask the developer to name the survey professional, contractor and person responsible for checking compliance on site. Find out who will brief crews, mark areas to avoid, maintain protective measures and stop work if the plan does not match field conditions.
As landowner, do not assume that a contractor’s presence transfers every responsibility away from you. FWC says landowners must obtain a permit to relocate tortoises before land clearing and development within 25 feet of a potentially occupied burrow. Ask your own adviser to review responsibilities and the actual access agreement.
Have the written permission specify allowed activities, routes, timing, notice and who pays for survey, permitting, repair and restoration. A walk-through, vegetation clearing and heavy-equipment staging are different requests. An access agreement does not itself grant a wildlife permit.
| Before allowing work | Ask the project team |
|---|---|
| Field survey | Who surveyed each proposed work and access area, and when? |
| Work map | Where are burrows, routes, clearing and staging shown? |
| Avoidance or permit | How will work avoid impacts, or what authorization applies? |
| Site oversight | Who briefs crews and stops work when conditions change? |
| Agreement | What work is authorized, and who pays for repair? |
If clearing or ground disturbance has already started
Stop the affected work and contact the project lead and FWC promptly for site-specific direction. Keep equipment and people away from the suspected burrow while the situation is assessed; do not attempt to repair or investigate it yourself.
FWC says a disturbed site permit may be required when vegetation or ground disturbance occurred before surveys were complete or before required capture and relocation were completed. Ask FWC and the qualified consultant what applies before work resumes. Do not assume a later permit automatically resolves earlier activity.
Keep the work plan, dates, photos taken from a safe distance and contact details available for the professionals reviewing the site. FWC provides a Wildlife Alert hotline at 888-404-3922 for suspected violations.
Ask about your property before granting access
Send Sunland your contact details and the property location to start a conversation. Mention a known or suspected burrow or an access request if relevant; detailed property information is optional. You do not need to allow entry to make an inquiry.
Further review must establish the site conditions, proposed work and applicable approvals. Sending information through the form does not authorize entry, clearing, testing, construction or an application in your name.
Questions landowners ask
Does a burrow automatically rule out solar?
Not necessarily. Ask for a field survey and a plan for avoiding burrows and tortoises or obtaining any required FWC authorization before work.
Can equipment be staged near a burrow?
FWC includes heavy equipment staging among development activities that should avoid burrows and tortoises by at least 25 feet if relying on avoidance. Have the team check the actual location and applicable requirements before staging.
What if work has already disturbed the area?
Stop affected work and contact FWC and the project’s qualified consultant. A disturbed site permit may be required, depending on the circumstances.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.