Trace the road from the public turnoff to the project gate
Ask the developer to show the full route from the public road to the site, including the private segments, adjoining properties, existing entrances and proposed connections. Mark where each segment changes ownership or use. Gather the deeds, survey, recorded easements and any written road permissions for the private land. If people use a route today, ask counsel and the appropriate road authority what rights apply before changing it.
Ask IDL which lands and routes are part of the state solar proposal and which plans it has actually approved. Obtain the lease provisions and relevant exhibits, including the drawing of roads, gates and areas the developer proposes to reserve for its own use. Use the dated project drawing and survey to locate those features on the ground.

Check what the state lease says about public use
IDL publishes a solar lease template. Its public-use clause, section 2.3.11, addresses lawful uses authorized by the State Board of Land Commissioners outside fenced solar areas. It makes exceptions for uses incompatible with the lessee’s uses under the lease and for exclusive-use areas the state lessor approves. The template requires prior written approval for a lessee to restrict Board-authorized public use of state land and expressly says it does not authorize trespass across private land to reach state land.
Sections 6.3.1 and 6.3.2 of the template call for a construction plan that identifies road details such as gates and describes the areas the lessee proposes to use exclusively and the basis for excluding others. The posted template illustrates what to look for. Ask IDL for the applicable terms and approved exhibits for the actual project.
IDL’s recreation policy covers its staff’s management of general recreation on endowment land. For closures or restrictions it addresses, the policy calls for a written notice identifying the affected area or route and how the restriction will be posted. Ask IDL what current orders, maps or notices apply and whether the developer’s plans would change an existing state-land access route.
| Record | What to match to the map |
|---|---|
| Private title and road documents | Road boundaries, existing users, permitted activities and any rights that cross the property line. |
| State solar lease and construction plan | Road and fence locations, project gates, approved exclusive-use areas and permitted activity. |
| IDL recreation records | Existing lawful approach to the state land and any written restriction, affected segment and posting location. |
Set the terms for the road you are asked to grant
If a proposed project gate shares an approach with a trail, ask the developer and IDL to trace both routes on the drawing. Confirm where the construction vehicles turn, where the public can lawfully enter state land and where any signs will direct people. If the gate moves, ask who needs to review the new location and which map or agreement must be updated.
Have counsel identify the road users, allowed vehicles and activities, and whether construction, maintenance and emergency use have different terms. Review responsibility for gates, signs, repairs and notice, and what happens to the road rights if the project is assigned or the state route changes. Attach the agreed route and access terms to the private agreement before granting the requested use.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDiscuss a solar land opportunity
Sunland welcomes inquiries from landowners and authorized representatives across the United States about sales, leases and assignments of existing solar agreements. Share the general location and whether the proposal includes a road crossing or a boundary with state land. Keep deeds, maps and signed agreements for private review.
Questions landowners ask
Does the state solar lease give the public access over my private road?
The IDL template’s public-use clause concerns the leased state land and expressly excludes authorization to trespass on private land. Have counsel check any existing rights and the proposed grant for your specific road.
How do I check whether a route on the state tract will be closed?
Ask IDL for written restrictions and the approved construction plan. Compare the route, gate and date shown in the applicable records and ask which notices or signs IDL will use.
What if the developer moves the project gate later?
Compare the new gate and its approach with the private grant, the state-approved plan and any public access records. Confirm who would need to approve the change before the new route is used.
Sources & further reading
IDL’s published lease template and recreation policy were checked November 21, 2026. Confirm the actual state lease and approved route with IDL and your private road rights with Idaho counsel. Local rules and program details can change. Check the requirements for the actual project.