Identify the easement and the land it covers
Illinois NRCS describes Emergency Watershed Protection floodplain easements (EWP-FPE) as permanent conservation easements. The landowner retains ownership and certain rights, while NRCS acquires surface and other rights to restore and enhance floodplain functions. Get the recorded deed, legal description, exhibits, amendments, title report and survey; ask NRCS for records if needed. Locate both the protected area and any separate access granted to the United States.
The published NRCS-LTP-20 floodplain warranty deed is an example, not proof of your deed. It describes the easement area in Exhibit A and access to it in Exhibit B, reserves specified rights to the owner, and binds successors and lessees. Read your executed instrument and any special provisions with Illinois counsel. A floodplain map or program name alone does not establish the legal boundary or the rights conveyed.
This discussion concerns NRCS EWP floodplain easements, not every federal conservation or flowage easement. An NRCS wetland easement, a federal buyout or a flowage easement held by another agency can have different instruments, owners and approval processes. Identify each interest and contact its holder.

Map the whole crossing
Request a scaled overlay showing parcel and easement boundaries, existing roads and rights of way, project fencing, temporary and permanent roads, gates, culverts, collector lines, poles, trenches, staging, turnarounds and restoration areas. Include the work needed to install, inspect, repair and eventually remove facilities, and the frequency and weight of traffic. A line serving panels outside the easement can still disturb protected land.
Trace each segment to the public road or interconnection point and identify who owns it and who holds any existing crossing rights. An existing farm road, utility corridor or right to cross for agriculture may have limits on beneficiary, purpose, location and intensity. It does not automatically authorize construction traffic, a widened road or an electrical line. The federal access described in the sample deed serves the United States; it is not a grant to the solar developer.
Ask NRCS about the actual proposal
Provide the local USDA NRCS office with the deed, map and a description of the design, duration, soil disturbance, drainage, vegetation, traffic and restoration. Ask whether the work or use is allowed under the recorded deed, whether any authorization is available, and what process and documentation would apply. Obtain a written response before promising a crossing or allowing work. Do not assume that an approval will be granted or that a compatible-use authorization can secure a permanent project route.
Illinois NRCS says it may allow compatible uses when it determines they further protection and enhancement of floodplain functions and values, and it sets the amount, method, timing, intensity and duration. It gives managed timber harvest, periodic haying and grazing as examples. The published sample deed requires written authorization for compatible economic uses and lists several otherwise prohibited activities, including constructing structures, disturbing vegetation and planting or harvesting crops. Your deed and NRCS direction control the specific analysis.
A farm lease, past cropping, grazing or a prior authorization is not a general permission for solar. Ask NRCS what agricultural use is currently authorized, on which acres, for how long and under what conditions. NRCS says compatible use does not guarantee a particular level or frequency of use or vest rights beyond the easement. Avoid assuming that agricultural eligibility at enrollment means continued cropping is permitted.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landMatch the agreement to the rights available
Have counsel review any sale, option, lease, access grant or assignment alongside the title and NRCS documents before signing. Identify who will obtain necessary authorizations and third-party property rights, pay survey and application costs, maintain and restore the crossing, and bear delays or a denial. Consider conditions, deadlines and alternative routes rather than guaranteeing a crossing that remains uncertain.
A landowner can discuss a sale or solar lease with Sunland, and an owner or authorized representative can submit an existing project or agreement for possible assignment review. Explain the Illinois location, acreage, easement and proposed crossing. An inquiry does not grant entry or resolve NRCS or third-party rights. Sale, lease and assignment options remain subject to the actual documents and any required consents.
Questions landowners ask
Can the developer use an existing farm road?
Not automatically. Review the road’s legal rights and the floodplain deed, compare the proposed use and improvements, and ask NRCS and counsel what authorizations and other rights are needed.
Can an electrical line cross if the solar panels are outside the easement?
The line and its installation, access and maintenance can still affect the easement. Give NRCS the complete route and work footprint for review before committing to it.
Can I sell the land with the easement?
Illinois NRCS says the owner retains the land until sale or transfer. The permanent easement remains a title issue for a buyer; have counsel review the deed and disclosure obligations.
Sources & further reading
Illinois NRCS program guidance and the published sample deed were checked November 16, 2026. No individual deed, authorization, survey or project route was reviewed. Confirm current requirements and the specific proposal with NRCS and counsel. Local rules and program details can change. Check the requirements for the actual project.