Check the parcel and the two on-site use alternatives
King County Ordinance 19824 added battery storage to the resource accessory-use rules. Start with the property’s jurisdiction and zoning. King County’s permit guidance explains that agricultural zones in unincorporated King County allow battery storage as an accessory use under the code’s limits. The resource-use table and the county’s review can help you identify the rules for the actual parcel.
Under King County Code 21A.08.090.B.29, the total system capacity must be two megawatts or less. One alternative is electricity for on-site use only. The code includes net metering and vehicle charging on the site or in the immediately adjacent right-of-way in that definition. The other alternative covers a system intended primarily for on-site use that also participates in load sharing or another grid-connected electricity-sharing arrangement.

Ask what the proposed battery would serve
Ask the project team to identify the on-site farm activity, who runs it, which electricity use the battery would serve and any proposed sharing arrangement. For example, an owner who leases out the farming operation can ask whether the project depends on that farm tenant’s equipment and which agreements would support that use.
Ask the county to confirm the classification for the proposal, including how it evaluates the stated on-site purpose. If the proposal is primarily for the grid, ask what, if any, separate land-use path the parcel allows before relying on the offer. Ask the serving utility what it would require for the actual connection, metering or sharing arrangement.
Check what would continue after the deal
If the sale excludes part of the farm, compare the proposed parcel boundaries and retained rights with the activity the battery would serve. If a farm lease is ending or a new operator is coming in, check which farming and electricity arrangements would continue after closing.
Agree who will obtain the county and utility responses, who will handle any needed changes to existing agreements and when the parties can walk away if the proposed use cannot continue. Keep the approvals, signed property documents and written descriptions of the farm use and electricity arrangement available for the next owner or tenant.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDiscuss your property or existing agreement
Sunland welcomes inquiries from owners and authorized representatives nationwide about selling or leasing battery storage property or assigning an existing agreement. Share the general property location, your role and the transaction you are considering. Keep signed leases, utility records and other private documents out of your initial message.
Questions landowners ask
Can a King County farm battery share electricity with the grid?
The resource accessory-use provision allows load sharing or another grid-connected electricity-sharing arrangement for a system of two megawatts or less that is intended primarily for on-site use. Check the county’s classification and what the serving utility requires for the arrangement.
Is a battery within the capacity limit eligible for accessory use by itself?
The code sets both a capacity limit and an on-site use condition. Ask the county how those conditions and the parcel’s zoning apply to the proposal.
What if a different company takes over the farming operation?
Identify the farm activities and electricity use that will continue and which agreements support them. Ask the county and the utility what needs review if the operator or use changes.
Sources & further reading
Signed ordinance, current county code and county permitting guidance checked November 21, 2026. Confirm the parcel’s zoning, proposal classification and applicable utility requirements with the responsible parties. Local rules and program details can change. Check the requirements for the actual project.