Specify who supplies and installs the equipment
In the signed January 2025 Hagerstown warehouse lease between CRP/TCC Rhoton Owner LLC and Lifetime Brands, Inc., section 17.02 permits the landlord to install tenant-supplied backup equipment as part of the tenant improvements. The parties are to agree on a location in or next to the building. The clause groups battery storage systems with electrical generators and fuel tanks under one defined term. The cited filings establish the agreement and lease commencement, with the equipment installed at the facility unverified.
In your own lease, attach a list of the equipment and a drawing that identifies the approved location, area for service access and connections to the building. Clarify who orders, pays for and takes delivery of each item, who coordinates installation and who signs off on completion. If the tenant leases or finances the equipment, have counsel check who owns it and who may take it away. Identify which building improvements and connections are intended to stay.

Put the permitted uses and costs in writing
The Hagerstown clause limits use to periodic testing and interruptions of the tenant’s primary electrical service. It makes the tenant responsible for repair and maintenance at its own expense. For your property, agree on who plans testing, gives notice and keeps the maintenance records, especially when work could affect building access or service.
Ask the tenant and the qualified project team to identify which building loads the equipment will serve, what testing they propose and which party manages repairs. If someone later proposes another use, such as routine bill management, review the requested change with counsel and the project team against the signed use limits before authorizing it.
Agree on what the tenant must remove
Section 17.02 requires the Hagerstown tenant to remove the covered equipment, pads, tanks and associated equipment at expiration or earlier termination. It puts removal at the tenant’s expense and requires restoration of the affected premises to their pre-installation condition, with an exception for normal wear and tear, and repair of damage. Read equipment-specific provisions beside the general surrender terms.
Record the affected area’s condition before installation and keep the final inventory with the lease. Before handback, identify which equipment and improvements must leave, who will arrange that work and what evidence demonstrates completion. Set the inspection date and agree how to handle unfinished restoration before you promise the space to another tenant or buyer.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landDiscuss the equipment and lease terms for your property
Sunland reviews battery storage property sale, lease and existing agreement inquiries, including potential assignments, across the United States. Share the location, your role and whether the equipment is proposed or already covered by a lease. Keep signed agreements, drawings and equipment records available for private review.
Questions landowners ask
Does a tenant who supplies a backup battery have to install it?
The lease can divide those roles. The Hagerstown lease calls for the tenant to supply the covered equipment and permits the landlord to install it as part of the tenant improvements.
Can the tenant run backup equipment to lower its ordinary electric bill?
Check the permitted-use clause. The Hagerstown provision limits use to periodic testing and interruptions of the tenant’s primary electrical service.
If the landlord installed the equipment, who removes it?
Read the equipment rider and surrender provisions together. The Hagerstown rider puts removal and restoration on the tenant at expiration or earlier termination.
Sources & further reading
Sources checked November 20, 2026. The lease terms describe a particular commercial tenancy. The reviewed filings leave the selection and installation of any equipment and any later private amendments unverified. Local rules and program details can change. Check the requirements for the actual project.