Massachusetts landowner guide

Can battery storage be built on land with an activity and use limitation?

A recorded activity and use limitation (AUL) does not answer every battery storage proposal by itself. Obtain the actual AUL and its exhibits, then have the appropriate environmental professional compare its conditions with the proposed pad, trenches, access and future maintenance before work starts.

Could my land work?

Give the developer the recorded AUL, site plan and available cleanup records. Ask a Massachusetts Licensed Site Professional (LSP) to identify the restricted area, permitted and prohibited activities, and any soil handling, notification or maintenance obligations. Ask what changes or further review may be needed before signing construction or investigation rights.

Locate the restriction and its obligations

An AUL is a property-specific document associated with a cleanup. Read the recorded instrument and its exhibits together: boundaries, descriptions of allowed and prohibited activities, and obligations to maintain protective features can matter as much as the title of the document. A parcel map or listing alone does not establish where the restriction applies.

Gather the recorded AUL and amendments, plans showing its boundaries, cleanup reports, and records of inspections or maintenance. If a contemplated activity may be inconsistent with the AUL, the owner must hire an LSP to evaluate whether an amended or new AUL or additional cleanup is needed. Ask the LSP what applies to the proposed work and whether other parties or MassDEP should be consulted.

Illustration of a land parcel and surrounding landscape

Compare the AUL with the construction plan

Request a plan showing equipment pads, cable trenches, grading, fencing, access roads, drainage and staging areas. Compare each activity with the AUL and its exhibits, including restrictions on disturbing soil or protective surfaces and any applicable soil management requirements. A feature outside the equipment pad can still intersect the restricted area.

Do not assume shallow excavation is exempt or that a developer can simply remove a cover. Ask the LSP and project team to document the proposed controls, approvals or changes needed for the actual work before investigation or construction begins.

Plan for the full project term

Battery projects can require access for inspection, repair, replacement and eventual removal. Compare those activities with continuing AUL obligations and ask who will maintain any protective feature and retain the records. When a site is sold, MassDEP says the AUL must be incorporated in full or by reference in the transfer instrument, and the buyer or seller must submit the new deed to MassDEP. A change of owner or operator does not make the recorded document irrelevant.

Ask counsel to review investigation rights, environmental responsibilities, access, allocation of costs and restoration in the actual option, lease or sale documents. MassDEP provides compliance guidance for parties responsible for property subject to an AUL.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Prepare for a site discussion

Bring the property location, approximate acreage, recorded AUL and available cleanup and site plans. Identify who has maintained any required controls and what is known about previous disturbances. Share sensitive site records privately when requested.

Sunland reviews battery storage opportunities nationwide, including land for sale or lease and existing project agreements. An owner or authorized representative can submit the property and describe the known restriction for initial review.

Questions landowners ask

Does an AUL automatically prohibit battery storage?

The recorded terms and the proposed activities must be compared. Ask an LSP to review the actual document and plans.

Can the developer trench through the restricted area?

Do not assume it can. The AUL, cleanup conditions and proposed work must be reviewed before disturbance.

Which document should I provide?

Start with the recorded AUL, its exhibits and amendments, plus available cleanup reports and plans showing the proposed work.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Have land in Massachusetts?Tell us about your land