Read the restriction and identify its holder
Order a title search and obtain the complete recorded preservation restriction, legal description, plans, exhibits, amendments and any recorded assignments. Ask the holder for relevant guidelines and prior approvals. Check the premises covered, protected features, reserved rights, maintenance duties, permitted uses, notice and approval provisions, and whether the restriction remains in effect. A preservation restriction may last for a term or perpetually and binds current and future owners while in effect.
Massachusetts General Laws chapter 184, section 31 defines a preservation restriction as a right that can limit interior or exterior alterations, changes to the site, inappropriate uses and other acts detrimental to preservation. It does not itself determine whether this particular battery proposal needs consent. The Massachusetts Historical Commission (MHC) explains that the agreement specifies when and how prior written approval from the grantee is needed. Identify the actual current grantee or holder; it may be a government body or qualified organization, and is not necessarily MHC.

Compare the full work with protected features
Ask the developer for a scaled plan showing the battery enclosure, equipment, foundations, fencing, access, staging, cable and utility routes, drainage and any excavation. Overlay it on the restriction exhibits and a current survey. Show the mill, courtyard, gate, walls and other features, including construction access and temporary work. Ask a Massachusetts attorney and surveyor to resolve uncertain boundaries or language.
For a covered courtyard, identify paving, grading, equipment placement and changes to views or drainage. For the gate, show the proposed opening, removal or replacement, posts and construction vehicle clearance. For ductwork, show routes, penetrations, supports, vents and equipment inside and outside the building. A feature need not be visible from the street to fall within a restriction; coverage depends on the instrument. Work outside a mapped area may still affect protected features or other rights, so present the whole proposal to the holder.
Request a written determination before committing
Send the holder the recorded documents, photographs, plans, elevations, materials, installation methods and schedule. Ask which specific activities require prior written consent, what submission and notice procedure applies, and whether the proposed use itself is restricted. Request its written decision and any conditions before authorizing covered work. A preliminary conversation, a developer’s assurance or a permit is not a substitute for consent where the agreement requires it.
If the holder requests design changes, have the developer price and test them before relying on the layout. Do not assume consent or an amendment will be granted. With independent Massachusetts counsel, address study access, application costs and responsibility, deadlines, extensions, termination if necessary approvals are denied, restoration and decommissioning in any option or lease. Check whether the restriction or other agreements also require notice or consent for granting the lease itself.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSeparate listing from the recorded restriction
National Register listing and a preservation restriction are different. MHC says National Register listing is not itself a design review program and generally does not prevent a private owner using private funds from altering property. A recorded restriction can impose separate obligations, even on a listed property. Conversely, finding a listing does not establish the boundaries or terms of a particular restriction; obtain the recorded document.
Other reviews may apply independently. A local historic district or landmark ordinance, grant conditions, or state or federal funding, licensing, permits or approvals can trigger separate review. Ask the local preservation commission and MHC about the actual project and its approvals. MHC review of a state or federal undertaking and the restriction holder’s consent are distinct questions; one does not automatically replace the other.
Decide whether the offer still works
Compare the holder’s written response and any other review requirements with the developer’s layout, timing and economics. If the courtyard or gate cannot accommodate the design, ask whether an alternative location, access route or equipment arrangement is feasible before signing a binding commitment. Keep the approved plans and conditions with the property records and make sure the lease requires the tenant to follow them.
Sunland welcomes battery storage land sale, lease and existing agreement inquiries from owners and authorized representatives. Share the property location, approximate acreage and what you know about the restriction; provide records privately if requested.
Questions landowners ask
Does National Register listing mean the holder must approve battery storage?
Listing alone does not answer that. Obtain the recorded restriction and ask its holder whether the proposed use and work require written consent. Other local, state or federal reviews may also apply.
Does a gate or ductwork alteration require consent?
It depends on the protected premises, features and approval language in the recorded agreement. Submit the proposed changes to the holder and request a written determination before covered work.
Can equipment outside the restricted area proceed automatically?
No. Confirm the boundary and examine access, cables, construction and effects on protected features, as well as other applicable rights and approvals. Ask the holder to review the complete plan.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.
- Massachusetts Historical Commission: Preservation Restrictions
- Massachusetts General Laws, chapter 184, section 31
- Massachusetts Historical Commission: Effects and Benefits of Listing in the National Register
- Massachusetts Historical Commission: Review and Compliance
- Massachusetts Historical Commission: There’s a Difference