Compare farm energy and proposed output
The MDAR ground-mounted renewable energy guidelines dated December 20, 2018 state that rated annual output capacity in kWh or BTUs must be no greater than 2.0 times documented historical or projected annual agricultural energy use on the APR land or agricultural operation. The guidelines define that operation as a farming business constituting a single economic unit under the same ownership and control. Ask MDAR to confirm the policy and how it applies to the actual farm before relying on any calculation.
Collect utility bills and meter records, identify farm loads and any mixed residential use, and document proposed changes in agricultural energy demand. Ask MDAR which consumption and projections qualify and what proof it needs. Compare the resulting figure with the developer’s proposed annual output in matching units. A large lease payment does not establish that the array meets the guidelines, and the numerical limit alone does not guarantee a COA.

Place the array in the actual farm
Obtain the recorded APR, its exhibits and any prior approvals. Mark the restricted boundary, farm fields, soils, structures, roads, drainage and equipment access on a plan. Add the proposed panels, fencing, cable routes and related equipment. The guidelines call for a detailed site plan showing the system and existing structures and improvements; ask MDAR what additional information is necessary.
The guidelines require the location to minimize negative impacts to agricultural productivity and, if approved, avoid interference or likely interference with agricultural use and minimize impacts on productive agricultural land. They also specify soil protection conditions for prime or state-significant agricultural soils. Discuss field access, working patterns and future farm operations with the operator and MDAR; a seemingly unused corner may still have agricultural value.
Ask MDAR about a Certificate of Approval
Send the APR, energy records and preliminary sketch to the APR field representative and ask whether and how to request a COA for the specific ground-mounted proposal. The guidelines list prerequisites including commercial agriculture and applicable approval language in the APR. MDAR may grant approval with conditions; request a written decision before construction. Confirm current requirements and the actual restriction rather than assuming all APRs use identical terms.
The published ground-mounted system definition includes associated infrastructure, including energy storage. It excludes roof-mounted systems on existing structures and systems using agricultural resources such as biomass as inputs. Those exclusions concern this particular definition, not a blanket approval for any other proposal. The APR program guide states roof-mounted solar does not require approval; ask MDAR about the actual structure and restriction.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landReassess the offer and agreement
Ask the developer whether the proposal remains viable if output or layout changes to fit the farm and MDAR’s decision. With an attorney, review application responsibility and costs, access for studies, approval deadlines, extension and termination rights, restoration and decommissioning. The guidelines define a decommissioning plan and describe an additional requirement for certain non-contiguous or non-APR land served by the system. Ask MDAR how that applies to your operation.
A state-held APR differs from a private restriction; identify the actual holder and consult the relevant holder about its terms. Sunland welcomes land sale, lease and existing project inquiries nationwide. Share the location, approximate acreage and your relationship to the farm, and mention the APR; provide records privately if requested.
Questions landowners ask
Can a commercial solar offer use all available acreage?
Not necessarily. Review the recorded APR and proposed output and location with MDAR. The published guidelines include farm energy and agricultural impact conditions for a ground-mounted system.
Does twice the farm’s energy use mean automatic approval?
No. The published output limit is one prerequisite among others. MDAR reviews the particular proposal, restriction and agricultural impacts.
What should I bring to MDAR?
Bring the recorded APR and exhibits, farm energy bills and meter records, a proposed output estimate and a site sketch showing the system, farm features and infrastructure. Ask MDAR what else is needed.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.