Match both solar systems to the recorded parcel
Get the deed or registered title, recorded parcel plan and both project layouts. Compare the parcel boundaries with the land you already leased and the additional area the developer wants. If the current parcel boundaries result from a subdivision recorded after January 1, 2020, 225 CMR 28.08(4) requires the solar unit owner to show the Department that the subdivision was made for a purpose other than obtaining SMART 3.0 eligibility.
Ask for the existing system’s qualification records. The Department’s project segmentation guideline says a same-parcel system previously qualified under SREC I, SREC II, RPS Class I or the earlier SMART program under 225 CMR 20.00 does not affect qualification of a new system under this rule. Check the named program in the first system’s records and ask the developer which other eligibility requirements remain for the new one.

Check the records for any claimed exception
If the second proposal needs an exception, ask the developer for the specific provision and the documents it gave the Department. Section 28.08(5)(a)8 addresses a separately metered second system whose application is filed at least 12 months after the original system’s Commercial Operation Date. It also addresses systems whose owners can show they are unaffiliated to the Department’s satisfaction. Ask the Department how it applies that provision to the dates, ownership and meter arrangement for your project.
Section 28.08(5)(a)10 lets the Department grant an exception for good cause. The Department’s guideline calls for an explanation of why the design warrants an exception and evidence that the request serves a purpose other than obtaining a higher incentive. If the developer relies on an exception, ask for the Department’s determination and check which plans, meters and systems it covers.
Check how the second system would be paid
For projects that qualify separately through an exception, the Department’s guideline generally describes separate preliminary qualification records and compensation calculations unless the Department decides on a combined rate. For a good-cause exception involving two or more systems installed on one parcel with a combined capacity of no more than 5,000 kilowatts, §28.14(5) allows the Department to set the base rate using the combined capacity. It may also require one application and issue one Statement of Qualification.
Ask for copies of any preliminary and final qualification records and check the unit, capacity, conditions and compensation terms they identify. The final statement includes the final base rate and applicable adders, the tariff term and the incentive payment effective date. Use the signed option or lease to see whether any landowner payment depends on that incentive.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAgree what must happen before more land is reserved
Have counsel review which acreage, road rights and utility routes the developer can reserve for the second project and what it must provide before an extension or new lease term starts. If qualification or compensation changes the layout, decide which payment, deadline or land release provisions apply.
Sunland welcomes nationwide inquiries from landowners and authorized representatives about solar land sales, leases and assignments of existing agreements. Share the general location, whether a solar project already occupies part of the parcel and the decision you face. Keep title documents, site plans and detailed incentive records for private review.
Questions landowners ask
What if the first project was approved under an earlier incentive program?
Find its qualification record and check the program named there. The Department’s guideline explains which earlier programs allow the new same-parcel project to proceed under the SMART 3.0 segmentation rule, subject to the other applicable requirements.
Can the two systems share an interconnection point?
The Department’s guideline allows systems qualifying for a segmentation exception to share an interconnection point if each has its own SMART meter. Ask the developer to show the meter and interconnection arrangements and confirm which requirements apply.
What if a developer proposes dividing the parcel for the second system?
Get the recorded subdivision history. If the parcel boundary results from a subdivision recorded after January 1, 2020, the solar unit owner must demonstrate to the Department that the subdivision was made for a purpose other than obtaining program eligibility.
Sources & further reading
The published SMART 3.0 regulation and current Department of Energy Resources guideline were checked November 22, 2026. Ask the Department to confirm how the qualification and rate provisions apply to your project and its application. Local rules and program details can change. Check the requirements for the actual project.