Compare complete footprints and farm operations
Request plans for both alternatives showing panel supports and height, shade, electrical equipment, fencing, trenches, roads, construction staging and any off-site connection. Map bog beds, dikes, flumes, pumps, piping, reservoirs, drainage, access routes and neighboring resource areas. An upland array can still require wetland review if its road, cable, drainage or construction work affects protected areas or a buffer zone.
With the operator, test each plan against flooding and flood release, harvesting, sanding, irrigation, spraying and equipment turning. Ask how poles and cables affect access and maintenance, whether the work can fit the farm calendar, and how a damaged water-control feature will be repaired. Compare the value of retained production with lease payments, construction disruption and any costs to modify operations.

Separate farming practices from solar review
The Wetlands Protection Act regulations describe land in agricultural use and normal maintenance or improvement, including specified cranberry practices such as sanding, repair of water-control structures, regrading and replanting existing bogs, and flooding. Whether a particular activity qualifies depends on the regulations and facts. Do not extend an agricultural exemption for customary farm work to a new array.
MassDEP’s cranberry solar guidance says dual-use solar arrays are not normal maintenance or improvement of agricultural land because the activities are not directly related to cranberry production. It treats supports, shading and runoff in regulated wetland resource areas as alterations and calls for a Notice of Intent (NOI) review by the conservation commission and MassDEP. The permitting decision is site-specific; an NOI does not guarantee an Order of Conditions.
Prepare for the wetlands decision
Have a qualified wetlands professional delineate applicable resource areas and the buffer zone, document existing hydrology and farm management, and show all proposed work. Consult the local conservation commission early about the state process and any local wetlands bylaw. MassDEP’s WPA Form 3 process asks for resource-area boundaries and plans showing how proposed work meets each applicable performance standard; the applicant submits the NOI to the commission and MassDEP.
For bordering vegetated wetlands, the guidance calls for evaluating whether the project destroys or impairs the bog’s contribution to protected interests, taking its managed characteristics into account. Review may involve water supply, flood control, pollution, fisheries and wildlife, along with other applicable resource areas and rare species requirements. The guidance describes circumstances in which a project may be permitted; it is not a finding that this particular site or design will qualify. An Order of Conditions may impose design and operating conditions.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCheck incentives separately from permits
The MassDEP guidance discusses the SMART program as it stood in 2018. Do not use its historical size, height, shade or payment assumptions as a current incentive quote. Ask the developer to identify the current program, application status, eligibility rules, agricultural requirements, payment assumptions and deadlines in writing, and verify them with the administering agency. A qualifying incentive does not authorize wetland work, and an Order of Conditions does not establish incentive eligibility.
Compare the upland and bog alternatives with and without the projected incentive. Ask for assumptions about generation, crop yield, interconnection, taxes, maintenance and who bears costs if an incentive is unavailable or production falls. Neither an upland location nor a plan to continue growing cranberries guarantees approval or financing.
Make the agreement work for the farm
Before signing, have Massachusetts counsel review the option or lease alongside existing farm tenancies, mortgages, easements and water rights. Specify the approved footprint, retained farming and water access, construction windows, notice and repair obligations, crop and infrastructure damage, insurance, drainage, restoration and decommissioning security. Address changed designs, permit denial, operating restrictions and responsibility for applications and costs. Include measurable arrangements for access to dikes and equipment throughout the term.
Owners and authorized representatives can contact Sunland about Massachusetts solar land, sales, leases or existing projects. Sunland also welcomes inquiries nationwide. Share the approximate acreage, location, operating status and whether the proposal involves a bog or upland; provide sensitive farm and title records privately when needed.
Questions landowners ask
Does an active bog make a solar array exempt from wetlands review?
No. MassDEP’s guidance distinguishes exempt agricultural practices from dual-use solar structures in regulated cranberry bog wetlands and calls for an NOI.
Is an upland alternative automatically outside wetlands jurisdiction?
No. Map the whole project, including roads, cables, drainage and temporary work, and ask the conservation commission about applicable resource areas, buffer zones and local rules.
Does a wetlands permit qualify the project for an incentive?
No. Wetland permitting and energy incentive qualification are separate. Verify the current program and the proposed project’s eligibility with its administrator.
Sources & further reading
MassDEP’s published cranberry solar guidance and current wetlands regulation page were checked November 16, 2026. The guidance discusses historical SMART provisions; current incentive eligibility must be verified separately. Confirm applicable rules and local requirements for the site. Local rules and program details can change. Check the requirements for the actual project.
- MassDEP: Guidance on Agriculture and Solar Energy under the Wetlands Protection Act and SMART
- MassDEP: current 310 CMR 10.00 wetlands regulations and proposed revisions
- MassDEP: 310 CMR 10.00 regulation text
- Massachusetts DOER: SMART program information
- Massachusetts DOER: SMART 3.0 program details
- MassDEP: WPA Form 3 Notice of Intent
- MassDEP: Protecting wetlands in Massachusetts