Establish what was mined and what remains
Gather the parcel description, mining history, operator and permit information, site maps, amendments, annual reports and any deactivation or release documents. Ask DNR’s Lands and Minerals Division for the approved reclamation map and the current status of each affected area. Confirm whether chapter 6131 and a permit apply to this particular operation; do not assume that all historical peat removal has the same status.
Compare the records with a preliminary battery layout showing equipment, access, electrical routes and construction areas. Identify acreage affected by mining, acreage released, and acreage still subject to reclamation or other obligations. Stopped mining, revegetation or an expired business arrangement alone does not establish that the permittee has been released.

Review reclamation and water conditions
Minnesota’s peat rules address restoration, water control, deactivation and release of the permittee. Ask DNR and the operator for the approved postmining use, reclamation progress, water control and monitoring requirements, and any continuing responsibilities. Ask whether the proposed project would conflict with the approved plan or require a change and who must request it.
Have qualified professionals review the site’s hydrology, drainage, soils and proposed construction with the appropriate agencies. A former peat site is not automatically available for filling, and its history alone does not determine the current extent or regulatory status of wetlands. Separately identify applicable wetland, public waters and other reviews before relying on a layout.
Make the option reflect the actual risks
With your attorney, compare the proposed option and lease with the mining agreement, reclamation records and any landowner commitments. Identify who is responsible for remaining work, access, monitoring and costs, and whether the battery proposal would interfere with them. A release of a permittee should be checked against its actual terms and area; it is not itself approval for a battery project.
Set out who obtains and pays for records, studies and required approvals or amendments. Address the deadline, evidence of approval, extension payments and termination rights if a workable project cannot be approved. Do not promise unrestricted possession or a particular construction start until the relevant rights and conditions are understood.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAsk for the release request and decision
Under the peat rules, a request for release includes information about ownership of remaining structures and their continued maintenance, along with a map showing final topography and postmining drainage. Ask for those records and compare them with the battery layout and access routes.
Ask DNR for the actual commissioner decision as well as the request. The rules allow a release covering part of a deactivated area and allow conditions. Check the precise area and any conditions rather than assuming the entire property was released. Peat reclamation has its own rules; do not rely on a sand or gravel pit precedent to establish this site’s status.
Prepare an inquiry
Sunland welcomes nationwide land and existing project inquiries. Share the location, approximate acreage, your relationship to the property and the known peat operation history. Provide maps or reclamation records privately if available.
Questions landowners ask
Does a former peat operation rule out battery storage?
Not necessarily. The project depends on site conditions, existing rights, reclamation status and applicable approvals.
Does the end of peat mining mean reclamation is complete?
No. Ask DNR for the approved plans and actual deactivation and release records for the affected acreage.
Is all former peat land legally a wetland?
Its history alone does not establish its present wetland status. Have qualified professionals and the appropriate authorities evaluate the site and proposed work.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.