What should a Minnesota landowner disclose about wells before a battery storage sale?

If you plan to sell part of a Minnesota property for battery storage, locate the wells before signing the purchase agreement. The sale boundary can put a well, its supply line or access route on a different parcel from the buildings or fields it serves. Minnesota requires a seller to disclose known wells on the property being transferred; the parties should also address any continuing access or service rights in their agreement.

Could my land work?

Before signing an agreement to sell or transfer, give the buyer a written disclosure of all known wells on the property, with the legal description and county, a map showing each location to the extent practicable, and each well’s status. At closing and recording, coordinate the well disclosure certificate or an applicable deed certification with the closing agent. Map the split and arrange any continuing water, utility and access rights separately with counsel.

Map the sale boundary and known wells

Obtain the proposed legal description and survey of the acreage to be sold. Gather well construction and sealing records, previous disclosures, old site plans and maintenance records. Mark each known well, including sealed wells, and compare the locations with the proposed boundary. A surveyor or licensed well contractor can help investigate uncertain locations; do not assume a well is absent because it is buried or out of sight.

Show the pipes, pumps, electrical supply, treatment equipment and access routes serving both the sale parcel and retained land. Consider temporary construction areas, grading, fencing and battery equipment as well as future repair access. Disclosure addresses wells on the property being transferred; identify wells and infrastructure outside it too when they affect continued service.

Illustration of a land parcel and surrounding landscape

Deliver the disclosure before an agreement is signed

Minnesota Statutes section 103I.235 requires the seller, before signing an agreement to sell or transfer real property, to give the buyer a written statement about the status and location of all known wells on the property. Where wells are known, include the legal description and county, a map drawn from available information showing each well to the extent practicable, and whether each is in use, not in use, or sealed. If the seller knows of no wells on the property, the alternative is a written statement to that effect.

The requirement covers sales of real property generally, not only homes. The statute excludes transfers solely of severed mineral interests and individual condominium units, as well as temporary borings and unsuccessful wells sealed by a licensed contractor in compliance with the chapter. Ask counsel and the closing agent how the law applies to the actual transaction and parcel; do not assume a lease and a sale have identical requirements.

Prepare the closing and recording documents

At closing, the statute generally calls for a well disclosure certificate with the disclosure information, buyer’s name and mailing address, and each well’s quartile, section, township and range, signed by the seller or an authorized person. If the seller fails to provide a required certificate, the buyer or an authorized person may sign one based on the disclosure or other available information. The county recorder or registrar receives the certificate with the conveyance when the statute’s recording requirements apply.

A new certificate is not required if the buyer, seller or an authorized person certifies on the conveyance that the number and status of wells on the described property have not changed since the last previously filed certificate; the statutory certification must be signed. If the seller knows of no wells, the statutory no-known-wells statement in the deed or other conveyance is another path. A deed given under a contract for deed has special buyer or grantee provisions. Have the closing agent use the statutory wording and confirm the correct path, particularly where a new split may differ from the property covered by an earlier certificate. Do not certify unchanged status without verifying the prior filing and the property described.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Protect shared water service and access

A disclosure is not an easement or agreement to supply water. If a well or line on the sold parcel will continue serving retained land, ask counsel to document the rights needed for water use, pipes, electricity, access, inspection, maintenance, repair and replacement. Address cost sharing, service interruptions, metering where appropriate, relocation and what happens if the well fails. Consider the same issues if the sold land relies on a well retained by the seller.

Have the developer show how fencing, construction and future operations will accommodate those rights. Review the legal descriptions and any existing easements, lender requirements and recorded documents with counsel before signing. If a well is not in use or its status is uncertain, ask MDH and a licensed well contractor about the applicable repair, sealing or maintenance permit requirements; do not treat a cap as proof of sealing.

Bring the information to the negotiation

Agree who will investigate, pay for survey and well work, prepare disclosures, obtain any necessary approvals and resolve a change to the boundary or layout. Discuss what happens if shared service cannot be preserved or an unknown well is discovered. Counsel can review the purchase agreement and closing documents against the actual facts.

Sunland welcomes land sale, lease and existing project inquiries nationwide. Share the property location, approximate acreage and your relationship to it, and mention any wells or shared water service. Provide maps and records privately if requested for review.

Questions landowners ask

Must a sealed well be disclosed?

A known sealed well on the property should generally be included, with its status identified as sealed. The statute excludes temporary borings and unsuccessful wells sealed by a licensed contractor in compliance with the chapter. Check available sealing records; a cap alone is not sealing.

Does a prior certificate eliminate the pre-agreement disclosure?

No. The seller must provide the required written disclosure before signing the agreement. A signed unchanged-wells certification may avoid a new certificate if its statutory conditions are met.

Does the well disclosure preserve a water line across the sold parcel?

No. Identify the line and service needs, and have counsel address any necessary rights and responsibilities in the transaction documents.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.