Map the property and proposed solar work
Collect deeds, surveys, parcel maps, easements, existing approvals and the proposed solar layout. Identify the outdoor range’s perimeter property line and measure to the portions of the proposed project property within 750 feet. Show equipment, access, construction areas and utility routes as well as the panels. A map is a screening tool; ask a surveyor to resolve uncertain boundaries and distances.
Bring the records to the county, city or other authority responsible for the proposed approval. Ask what application, site information and review are needed, and whether another permitting authority has jurisdiction. The range’s location and compliance status, the nature of the proposed change and the specific approval history all matter.

Understand the conditional rule
Section 87A.04(a) addresses a change in use, new development or construction of a structure on any portion of property within 750 feet of the perimeter property line of an outdoor shooting range, when that change would cause a range in compliance with chapter 87A to become noncompliant. It excepts uses, developments and structures in existence or approved by October 1, 2005, and allows the mitigation pathway in paragraph (b). The date applies to those uses, developments and structures; it is not a blanket exemption for a parcel.
Being within 750 feet is not by itself a finding of noncompliance, and a solar project’s exact layout and use should not be assumed to satisfy or fail the statute. Ask the approving authority and Minnesota counsel how the statutory conditions and any applicable local requirements apply.
Document the authority’s decision
Under section 87A.04(b), a proposal subject to the section may be approved if the person seeking approval or, at the governing body’s discretion, the approving authority agrees to provide any mitigation required to keep the range in compliance. The person requesting approval is responsible for providing documentation if no mitigation is required. Ask the authority what documentation it expects, who will prepare it and when it must be submitted.
Request the decision and any conditions in writing, including whether mitigation is required, who must provide it and how completion will be verified. The statute permits required mitigation on range property only with the range operator’s permission. Do not assume a developer’s preliminary map or a conversation substitutes for the authority’s decision or that a neighboring owner has granted access.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landAllocate costs and timing before signing
Have independent counsel review an option, lease or sale agreement before signing. Specify who obtains surveys and studies, submits the application and no-mitigation documentation if applicable, pays for required work, secures any needed third-party permissions and maintains any agreed measures. Address approval deadlines, access, cost overruns, project changes and what happens if approval or permission is denied.
Section 87A.04 also specifies a conditional exemption from a finding of range noncompliance if required documentation or mitigation is not provided and that failure is the sole basis for noncompliance with the shooting range performance standards. It makes actions by the property owner against the range subject to section 87A.06. Discuss the consequences with counsel; do not assume a later dispute will solve an unresolved approval condition.
Bring the issue into the first solar discussion
Provide the developer with the approximate parcel location, available boundary records and known neighboring range information. Ask for a proposed footprint and a written plan for the review, including responsibility for costs and schedule. Keep preliminary proposals distinct from an approved layout.
Sunland welcomes inquiries from Minnesota landowners and authorized representatives about solar land sales, leases and existing agreements. Share the approximate acreage and location and identify known neighboring uses so the project can be screened.
Questions landowners ask
Is all land within 750 feet automatically unavailable for solar?
No. The statute has specific conditions concerning the proposed change and its effect on a range complying with chapter 87A. The approving authority must evaluate the facts and applicable requirements.
Who documents that no mitigation is required?
Section 87A.04(b) places that responsibility on the person requesting an approval subject to the section. The parties should agree who prepares and pays for the documentation.
Can required mitigation be placed on range property?
The statute allows it with the range operator’s permission. Obtain any necessary permission and address responsibility in writing.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.