Landowner guide

Can a former crop-service yard affect a Minnesota solar project?

A former crop-service yard may have stored, mixed or handled fertilizer and pesticides in places that overlap a proposed solar yard, cable trench or access road. Identify the old operations and gather records before committing to a layout or ground disturbance.

The short answer

Overlay the proposed work on a map of historic handling areas and ask a qualified environmental professional to review the property history and records with the Minnesota Department of Agriculture (MDA). An inactive storage permit or a missing map listing does not establish that the ground is clear. Investigation, restrictions and timing depend on the site and the proposed work.

Map former operations against the project

Gather old aerial photographs, site plans, construction and sales records, prior environmental reports and names of former operators or employees. Mark where pesticides or fertilizer were stored, mixed, loaded, transferred or disposed of, including bulk tanks, containment, loading pads, equipment parking and repair areas, seed treatment, drains, scale pits and places where runoff pooled. Record known spills and uncertain locations; buildings and equipment may have moved over time.

Ask the developer for a drawing showing the fenced yard, panels and equipment, foundations, underground cables, roads, grading, staging and temporary access. Compare both temporary and permanent disturbance with the historic map. A qualified environmental professional can help identify gaps and decide whether the layout should avoid particular areas while the history is evaluated.

Illustration of a land parcel and surrounding landscape

Obtain facility, permit and incident records

Search MDA’s What’s In My Neighborhood agricultural map and the county spill report for the property and surrounding area. Record relevant project file numbers and request the underlying facility and incident files from MDA’s Data Practices and Records Management staff. Ask for inspection, storage permit and deactivation or decommissioning records, investigation and sampling reports, cleanup decisions, closure letters, maps and any continuing conditions. Supply the site name, address, location and known former operator names. Old spill locations may be inaccurate, so a map point alone may not locate the event.

MDA’s agricultural incident data are separate from Minnesota Pollution Control Agency records. Ask the consultant to check both, including other potential issues such as petroleum. A deactivated permit describes permit status, not necessarily the condition of soil or groundwater; an absent listing is not proof that no release occurred. Review the actual files and document missing records.

Ask what must happen before work

Give MDA and the environmental professional the historic map and proposed footprint. Ask whether an agricultural environmental site assessment, sampling, agency review or a voluntary investigation is appropriate, which areas and chemicals warrant attention, and what access and schedule are needed. MDA’s AgESA guidance describes a Phase I assessment supplemented with agricultural chemical-specific information; the scope and need should be assessed for this property.

Ask whether any closure is contingent on a structure remaining in place, a land-use limitation, monitoring or other controls, and whether the proposed excavation, grading or demolition changes those conditions. Obtain the actual documents and have the consultant and counsel interpret them for the proposed work. If a facility or remaining equipment is to be decommissioned, contact MDA early: its decommissioning guidance calls for contacting an agricultural chemical investigator at least 30 days in advance and discussing storage permit deactivation with its permitting program. Confirm current requirements for the particular work with MDA.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Keep the proposal flexible

Before signing, ask counsel to address who may enter and sample, who pays for investigation or cleanup, how results are shared, what happens if contamination or a restriction is found, and whether diligence and construction deadlines allow time for agency review. Ask the developer to identify alternative trench and access routes and to explain how it will handle unexpected conditions and restore disturbed areas.

An owner or authorized representative can ask Sunland to screen land for a solar sale or lease, or submit an existing project or agreement for review. Share the location, approximate acreage, known site history and proposed work; provide records privately when needed. A site can be considered for screening without assuming that the proposed layout or cleanup has been approved.

Questions landowners ask

Does an inactive storage permit mean the site is clean?

No. Permit status alone does not establish soil or groundwater conditions. Request the facility and incident files and have a qualified professional evaluate them.

What if the property is not on the MDA map?

A missing listing does not rule out a past release. Check the county spill report, underlying records and site history; older incident locations can be inaccurate.

Can solar work proceed at a closed site?

That depends on the closure documents, any continuing conditions and the planned work. Ask MDA and your consultant to review the proposed footprint and timing before disturbance.

Sources & further reading

Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Ask about your landTell us about your land