Minnesota landowner guide

Can I sell or lease Minnesota land for solar if it has a highway snow fence?

A strip of shrubs, trees or standing corn near a Minnesota highway may be part of a snow control arrangement that protects the road. A solar project can overlap the planted strip, the area where snow accumulates, or access needed to maintain it, even if the panels are farther away.

Could my land work?

A sale, lease or assignment may be possible, but first obtain the actual agreement, maps and any recorded easement, and compare their requirements with the complete solar and construction footprint. Ask the MnDOT district snow fence coordinator and the parties to the arrangement to review the proposed change and provide any required written concurrence or amendment before possession or work that could interfere. An annual corn arrangement and a multi-season planted fence need different timing and solutions.

Identify the arrangement and the people involved

Gather the signed agreement and amendments, exhibits, payment and inspection records, correspondence, title commitment, survey and any recorded snow fence easement. Identify the highway authority, landowner, farm operator or tenant, payment recipient and other signatories. Check the term, renewal, notice, transfer, assignment, termination, access, maintenance and remedy provisions. A contract and an easement are different interests; an agreement may not appear in a title search, while a recorded easement can remain relevant after a sale. Have counsel examine the actual documents and title rather than assuming the arrangement ends at closing.

MnDOT describes short-term agreements as one winter season: its standing corn row form is for corn alone, while its temporary blowing snow control form can cover multiple treatments. Its long-term agreements cover multiple seasons, including rooted trees, shrubs, grasses and wildflowers. MnDOT also describes structural fences, for which it typically acquires an easement or makes an agreement. The forms illustrate the program, but the signed site-specific documents control the particular obligations; do not assume all snow fences have identical terms or that a payment automatically transfers with land.

Illustration of a land parcel and surrounding landscape

Map the snow and the entire project

With the district coordinator and surveyor, locate the highway right of way, fence or corn rows, any easement or agreement area, required access and the expected snow storage or catch area. MnDOT explains that living barriers trap blowing snow before it reaches the road. The area affected by accumulated snow can extend beyond the visible planting or corn rows. Determine the actual site boundaries and restrictions from the documents and agency review; a visible row or a generic setback is not proof of the legal or functional extent.

Overlay panels and security fencing, roads, gates, underground lines, drainage, grading, entrances, deliveries, crane paths, laydown and temporary construction staging. Check whether snow storage, drifting, spring melt, maintenance equipment or access conflicts with each use, including temporary work before operation. MnDOT describes a typical corn fence as a quarter-mile long and 16 rows wide, set back 120 to 240 feet from the highway right of way; these are examples, not a required setback or a substitute for the site plan.

Resolve changes with the right parties

Give the MnDOT district coordinator, owner, operator and project team the current documents, overlay, work schedule and proposed changes. Ask whether the fence must remain, whether relocation, replacement, redesign or termination is acceptable, and which approvals, notices, signatures, easement changes or recorded instruments are needed. Request written, site-specific concurrence and executed amendments where required before clearing vegetation, moving corn, grading or obstructing snow storage. A private solar contract cannot itself modify the highway authority’s rights or promise approval.

For standing corn, verify the signed season, rows, harvest or removal date and the operator’s obligations before scheduling field entry. For perennial plantings, address multi-season establishment, access, protection and replacement or maintenance. Check whether other conservation or funding agreements apply and contact their administrators separately. If the parties cannot agree on a workable solution, preserve the existing arrangement and reassess the solar footprint or timing.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Set compensation and possession in the transaction

Reconcile earned and future snow fence payments, maintenance costs, crop value, snow storage and any relocation or replacement expense with the signed arrangement. MnDOT publishes information on annual payment adjustments and state vendor registration, but payment amount, recipient, eligibility and treatment on a change of ownership depend on the actual arrangement and MnDOT’s decision. Ask MnDOT and the current recipient how payments and obligations will be handled; do not assume a buyer, tenant or assignee can collect them automatically.

In the sale, lease or assignment, specify who gives notices and obtains approvals, who performs and pays for maintenance or an approved change, how compensation and losses are allocated, and the remedy if required concurrence is unavailable. Set separate dates for survey access, possession, construction entry and any corn harvest or fence work; preserve the operator’s and MnDOT’s necessary access until obligations are resolved. Make the relevant closing or possession milestone conditional on the agreed written resolution, with counsel addressing title and recording where needed.

Prepare a solar land inquiry

Sunland welcomes nationwide solar land sale, lease and existing agreement assignment inquiries and may contract for a property and assign the agreement to a specialist. Share the Minnesota county, approximate acreage, present use, expected possession date and known snow fence arrangement. Provide maps, title and signed agreements securely when requested. An inquiry does not commit the owner or establish project feasibility.

Questions landowners ask

Does a solar sale automatically end a snow fence agreement?

Do not assume it does. Review the signed agreement, any easement and title with counsel and ask MnDOT what notices, approvals or changes are required.

Can construction staging occupy the snow storage area?

It depends on the site and the applicable rights and restrictions. Map temporary staging as well as permanent facilities and obtain MnDOT’s written assessment and any required approvals before interfering with the arrangement.

Is standing corn treated like a perennial living fence?

MnDOT lists standing corn agreements for one winter season and long-term agreements for multiple seasons of rooted plantings. Check the executed site-specific agreement and coordinate the actual removal and possession dates.

Does the buyer receive the snow fence payment?

Not automatically. Confirm the named recipient, earned payments, future eligibility and any changes with MnDOT and the parties to the agreement.

Sources & further reading

Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.