Minnesota landowner guide

A solar carve-out on land with a registered hemp location

A solar proposal may take only part of a farm, but its fence, road or cable route can cross a tenant’s registered hemp location. Map the overlap and settle possession and access before promising the land to another party.

Could my land work?

Compare the solar drawing, the existing farm agreement and the licensee’s current location map. Decide whether to move the solar footprint, agree on a revised area and transition date with the tenant, or defer the transaction. The Minnesota Department of Agriculture (MDA) says a licensee must submit a change request for location changes; ask the licensee to confirm the actual change and timing with MDA. Registration does not itself settle private possession rights.

Put all three boundaries on one drawing

Ask the hemp licensee for the current registered grow-location map and the farm lease or other written permission defining the area they may use. Ask the solar party for a dated plan showing the option or leased area, fence, panels, equipment, roads, cables, staging and temporary construction access. Overlay those on the parcel boundary, gates and routes the tenant and owner use. Mark uncertainty rather than treating an approximate sketch as a survey.

For example, a solar fence may leave most of a field outside the project while its access road cuts through the registered area. Compare the whole road and construction corridor, not just fenced acres. Identify retained land, crossings and any potentially separated areas. The MDA change form defines a grow location as contiguous and says non-contiguous locations must be registered separately; ask MDA how the actual revised map should be treated.

Illustration of a land parcel and surrounding landscape

Agree on possession and the transition

Review the farm agreement with counsel for its term, renewal, notice, early termination, access and any consent needed to grant competing rights. A proposed solar option, investigation right or sale may affect the tenant before construction begins. Ask who can enter, when exclusive possession starts, and what happens if the project is delayed or abandoned.

If the tenant will give up part of the area, negotiate a written amendment with a clear exhibit, effective date, retained access, compensation and responsibility for damage. Coordinate any existing crop or equipment and the handover schedule with the licensee. If the parties cannot agree on a workable transition, consider changing the layout or waiting until the existing rights end. Do not assume a sale or solar lease automatically ends the tenant’s rights.

Coordinate the licensee’s site records

MDA says licensees may add or change grow locations during the license period using its change request form, with additional location fees if applicable. The form asks for updated location information and a detailed map. MDA says a site must be registered and paid for before hemp is grown there. The licensee should ask MDA whether the proposed carve-out, split, relocation or ownership change calls for an update, what must be submitted and when. A signed solar agreement alone does not update the MDA record.

MDA says rented land requires the owner’s consent, owner contact information and unrestricted inspector access to the grow locations. On a sale, identify the buyer and handover date and have the licensee confirm with MDA how to update owner information and document any continuing consent. On a lease, agree who controls gates and routes so access to any retained registered location remains available. Do not assume that an owner or a solar developer can change the licensee’s record for them.

Specific grow and processing location information is nonpublic according to MDA. Request the map directly from the licensee and share it only with the people who need it, with appropriate permission. Confirm current program requirements directly with MDA before relying on a proposed transition.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Compare the commercial choices

For a sale, ask how the buyer will take title and possession subject to existing agreements and how any tenant release or amendment fits the closing schedule. For a solar lease, compare the reservation period, rent start, final acreage and construction rights with the tenant’s term and the proposed handover. A smaller footprint can preserve a tenant’s use, but only if the access and boundaries work in practice.

If an existing solar option, lease or project may be assigned, review the assignment and consent terms with counsel. Identify who assumes payments, access obligations, restoration and tenant coordination, and whether the original party remains responsible. Registration and a private assignment are separate matters; ask the licensee and MDA about any site-record consequences.

Bring the question to Sunland

Sunland accepts inquiries across all 50 states. An owner or authorized representative can ask Sunland to screen land for a solar sale or lease, or submit an existing solar agreement or project for possible assignment or review. Share the property location, approximate acreage, the proposed transaction, tenant and solar timing, and the known overlap. Mention any deadlines or access that must remain available.

You can begin without sending the sensitive location map. Describe the issue first and arrange private sharing with the licensee’s permission if a detailed review needs it. Screening does not grant entry or determine project feasibility, tenant rights or MDA approval.

Questions landowners ask

Does a solar lease automatically remove the hemp location from MDA records?

No. MDA directs licensees to use a change request for location changes. The licensee should confirm the needed update and timing with MDA.

Can the owner sell while a tenant has rights to the land?

That depends on the agreement and transaction. Have counsel review the tenant’s rights, notice, possession and any required consent before agreeing to a closing or handover.

Can a solar road split a registered grow location?

It may affect the mapped area or access. MDA’s form defines a grow location as contiguous and says non-contiguous locations must be registered separately. Ask MDA to evaluate the actual layout.

Can Sunland review an existing solar agreement?

An owner or authorized representative can submit an existing agreement or project for review or possible assignment, along with the location and the known tenant issue.

Sources & further reading

Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.

Want to ask about your land?

Send the location and what you know about the property. You don’t need a project plan, and you are not committing to a lease or sale.

Tell us about your land
Have land in Minnesota?Tell us about your land