Confirm the owner and the land available
This guide concerns a cemetery corporation subject to New York’s cemetery land lease provisions. Do not assume every religious, municipal, family or other burial ground is governed by the same process. Check the organization’s status with counsel and the Division of Cemeteries, and identify the legal owner, governing documents and any other required authority.
Gather the deed, survey, burial and lot records, maps, cemetery development plan and existing leases. An open-looking field is not proof that it is free of burial rights or unnecessary for future cemetery use. Compare the proposed lease term with future burial capacity, paths, service areas and visitor access; consider a smaller footprint, shorter term or declining the offer if the land will be needed. The statute limits the initial term to 49 years. The Board may approve extensions up to 99 years total, with security updated at year 49 and every 20 years afterward when applicable; those limits are not an entitlement to approval.

Map every part of the proposal
Ask for the complete battery plan showing equipment, fence, construction staging, access, cables, drainage and any proposed buffer. Overlay it on the cemetery’s plans and the boundaries of existing agreements. Identify when construction and maintenance vehicles would enter and how services, visitors and cemetery staff would continue to use the property.
Section 1506-e requires a proposed lease adjacent to cemetery operations to provide a Cemetery Board-approved physical or visual buffer. Other provisions address hours of activity and environmental risk. Ask the project team for the actual design and local permitting and safety review; the cemetery statute does not supply a universal battery setback or establish that a particular design is safe.
Distinguish compatibility from approval
New York law deems energy storage equipment, including batteries within the cross-referenced definition, to meet the specific criterion concerning disruptive cemetery activity and significant traffic impact. That deeming addresses one criterion. It does not approve the lease or remove the other statutory, local, environmental or agreement requirements.
Generally, section 1506-e requires notice to and approval by the Cemetery Board before a cemetery corporation leases land, subject to the statute’s narrow exceptions. The application includes approval by the lot owners or directors, disclosure of existing land leases, and an arm’s-length lease for fair market rent containing the parties’ agreements. Ask counsel and the Division which documents and approvals apply to this proposal.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landIf solar is already on the property, compare approvals
Obtain the executed solar lease, amendments, approved drawings and Cemetery Board decisions. Mark the proposed batteries and related infrastructure against the approved area, use, access and term. A battery addition may affect more than a pad: it can change construction routes, maintenance access, removal costs and the land reserved from future cemetery use.
The statute requires Board approval for a material modification, alteration or expansion of a lease or infrastructure outside the scope of prior approval. Ask the Division and counsel how the actual amendment is treated before granting the new rights. Assignment or sublease provisions also need individual review; a change in project scope should not be assumed approved merely because the lease can be assigned.
Allow time for notice and review
The application process includes public notices near the proposed leased land, at the cemetery office and at entrances, subject to the statute’s location conditions. If new structures are proposed, notices include an accurate drawing. The statute specifies when notices may be posted relative to submission and requires a comment deadline no earlier than 60 days after posting; that is not a promise of a Board decision within 60 days.
Discuss the proposal and drawings with the cemetery’s decision makers early, and keep records of the required approval and notices. Have counsel align any option or lease conditions, access rights and deadlines with the actual process. Ask what happens if the Board requires changes or approval is not obtained; a developer’s schedule does not replace the required review.
Plan removal and restoration for cemetery use
An application must include at least two written estimates for removing the applicable infrastructure and returning the land to a condition suitable for burial purposes. Have qualified parties price the equipment, foundations, underground facilities and restoration scope identified in the proposal. Compare those estimates with the lease obligations and the cemetery’s future plan.
The Board approves the type and amount of security. Proof that it is in place must be submitted before construction, and the security must remain effective through the statutory restoration, removal, payment-proof and applicable compliance conditions. The security amount does not cap the responsible parties’ restoration obligations. Retaining facilities for cemetery use requires the specific Board approval described in the statute.
Calculate what income the cemetery can use
Compare the full rent schedule, escalations, expenses and tenant responsibilities, including taxes and charges related to occupancy and use. The statute generally directs lease payments and other consideration, less necessary expenses incurred, to the cemetery’s permanent maintenance fund. Gross rent is therefore not automatically money available for current operating expenses.
The Board may permit a portion to be used for specified projects or to maintain, preserve or expand current cemetery operations upon the required showing of need. Ask the Division and your accountant how the actual payments and expenses should be handled, and obtain any permission required before budgeting the money for another use.
Prepare the decision and next conversation
Keep the status and title records, burial-capacity plan, existing approvals, complete proposed lease or amendment, valuation, two restoration estimates and proposed security together. Compare a new lease, a revised solar lease, a smaller site and no transaction against long-term cemetery needs. Have counsel review the term, options, assignment, restoration and approval conditions before a binding commitment.
Sunland welcomes nationwide battery storage land sale, lease and existing agreement inquiries from owners and authorized representatives. Describe the New York property, cemetery status, existing solar agreement if any and available area. Sunland may contract for a property or agreement and then assign its interest to a specialist, subject to the actual terms and required consents. An inquiry does not grant land rights or secure Board approval.
Questions landowners ask
Does the statute automatically approve batteries on cemetery land?
No. It deems qualifying energy storage equipment compliant with one traffic and cemetery-operation criterion. The lease and other applicable requirements still need review and any required approval.
Can batteries be added to an approved solar lease without further review?
Compare the approved lease and drawings with the actual proposal. A material modification, alteration or expansion or infrastructure outside the prior approval requires Cemetery Board approval.
Can the cemetery spend all battery rent on operating expenses?
Not automatically. The statute generally directs consideration less necessary expenses to the permanent maintenance fund, with a Board-permitted exception for specified cemetery purposes upon a showing of need.
When must restoration security be in place?
Proof of Board-approved security must be submitted before construction. The security must continue through the applicable statutory restoration, removal, payment-proof and compliance conditions.
Sources & further reading
New York statutes checked November 18, 2026. No individual cemetery records, lease, approval or site plan was reviewed. Confirm the owner’s status and the applicable process with counsel and the Division of Cemeteries. Local rules and program details can change. Check the requirements for the actual project.