New York landowner guide

Can a solar project take possession of a New York hemp lot after a noncompliant result?

A solar closing or construction date may be approaching when a New York hemp grower receives a noncompliant result from an official regulatory sample. The result concerns a particular lot, but the project may also depend on roads, staging and access around it. A landowner needs a practical possession plan that leaves the licensed grower able to address the state process.

Could my land work?

Identify and exclude the affected lot from the immediate handover, and defer possession and construction there while the licensed grower retains custody and works with the Department of Agriculture and Markets. Compare delaying the whole closing with splitting possession or construction into usable phases. Put boundaries, access, responsibilities and the evidence needed for a later handover in writing with New York counsel and the parties before work starts.

Confirm the result and the lot

Obtain the regulatory result, chain of custody, Department notice and dates from the licensed grower. Match the sampled lot to its New York site ID, Farm Service Agency lot number and mapped boundaries. Overlay the proposed solar fence, roads, cables, staging and temporary work areas. A parcel boundary on a purchase plan is not necessarily the boundary of the sampled lot.

Record when the result and any regulatory notice were received, who received them and what the Department has said about the next step. A laboratory result, a Department notice and a later documented outcome are different events. Do not treat a planned closing date or a private agreement as a substitute for the Department’s process.

Illustration of a land parcel and surrounding landscape

Distinguish private testing from a regulatory sample

The Department’s 2026 reporting package distinguishes informal tests requested by a grower from formal regulatory samples requested by the Department. Its Non-Compliant Report is due within five days of receiving a noncompliant informal result, and expressly says not to use that form for a formal sample. The state’s noncompliant guidance directs the official-sampling branch to Department contact about options.

For a regulatory result, ask the grower and Department to confirm the applicable process and dates promptly. The regulation and Department guidance describe response obligations and options using different timing language. The grower and counsel should confirm the applicable deadline and next step with the Department promptly; neither a result nor a notice gives the solar parties an automatic extension of closing.

Choose a possession and construction plan

Compare three written alternatives: postpone the entire closing or possession date; close or hand over only an unaffected, independently usable area; or phase construction outside the affected lot while leaving that lot and necessary access under the grower’s control. Check whether the contract, lender, insurer and developer allow a split, and whether an unaffected area can actually be accessed and built without crossing or using the excluded area.

Attach a scaled exclusion map and describe the exact possession line, permitted access, gates, notice, security and emergency contacts. Include temporary work and contractor routes, not just the permanent solar footprint. Do not assume fencing or marking alone changes anyone’s legal rights or satisfies a regulatory requirement. The grower must retain the access and custody needed to respond to the Department.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Document the later handover

Set a process for the grower to provide the Department’s written outcome and any relevant records to the owner and developer, with sensitive information shared privately. Identify who reviews the documents, who confirms the area is available for possession, and how the parties record acceptance and update the construction schedule. A result or report alone should not be described as automatic clearance; confirm the specific outcome with the Department and counsel.

The state flowchart lists different report dates for different outcomes, including a remediation report within five days after remediation and a disposal report with proof of destruction within 15 days of disposal. Those reporting dates are distinct from the regulatory notice trigger and do not decide the possession date. The licensed grower should work directly with the Department on obligations and evidence; the solar parties should not undertake crop handling.

Allocate delay and compare the transaction

Have New York counsel review the land contract, existing farm lease, grower rights and any required consents. Address delayed possession, outside dates, payments, taxes, insurance, access, schedule changes and the consequences if the excluded area cannot be delivered. A phased closing needs a workable legal description and a plan for utilities and access, not merely a date on a construction calendar.

Owners and authorized representatives can contact Sunland about New York solar land or existing projects. Sunland also welcomes inquiries nationwide about selling or leasing land and assigning existing project interests. Share the approximate location, acreage, proposed transaction and timing; provide the lot map and regulatory documents privately when appropriate.

Questions landowners ask

Can the buyer close on an unaffected portion while the grower retains the sampled lot?

Possibly. Excluding the affected lot and phasing the transaction and construction depend on the agreement, access, consents and regulatory circumstances.

Should the grower file the 2026 Non-Compliant Report for an official regulatory sample?

The 2026 form says it is for noncompliant informal samples and not formal samples. The grower should confirm the regulatory-sample process and applicable obligations with the Department.

When can the affected lot be handed over?

There is no automatic handover date in this plan. Obtain the documented outcome, confirm the applicable requirements with the Department and counsel, and complete the parties’ agreed possession process.

Sources & further reading

New York Department of Agriculture and Markets hemp guidance, reporting flowchart and 2026 reporting package, and 1 NYCRR 159.12 were checked November 17, 2026. Confirm current requirements and the specific notice and outcome with the Department and counsel. Local rules and program details can change. Check the requirements for the actual project.