Ohio landowner guide

What does a solar access easement restrict on Ohio land?

If a solar project asks you to sign a sunlight easement over retained or adjoining Ohio land, compare the proposed limits on buildings and vegetation with how you expect to use that land before signing. A solar access easement can bind the land beyond the current owner, so the mapped area and termination terms matter as much as the payment.

Could my land work?

Request the complete proposed easement and every referenced exhibit, then mark planned buildings, tree growth and uses on a parcel map. Compare the burdened and benefited property descriptions with the deeds and ask an Ohio real estate attorney to review the restrictions, duration and release process before you sign.

Identify the land burdened and benefited

Ohio Revised Code section 5301.63 requires the instrument to describe both the property burdened by the easement and the property benefited by it. The burdened land is the land subject to the restrictions; the benefited land is the land receiving the solar access. Ask for legal descriptions and a legible exhibit showing parcel boundaries, the proposed solar equipment and the area to be restricted. Compare these against deeds, surveys and the proposed sale or lease exhibits.

If you are selling or leasing only part of a farm, check whether the restriction reaches the land you retain. If your land adjoins a project, verify exactly which part of your parcel would be burdened. Ask the project team and your surveyor to resolve mismatched acreage, boundaries or descriptions before the documents are signed.

Illustration of a land parcel and surrounding landscape

Test the height and location limits

The statute requires a description of limits on the heights, locations, or both, of permissible development on the burdened land, in terms of structures, vegetation, or both, to provide solar access for the benefited land. Read the actual proposed language and drawings together. Ask how height is measured, where restrictions apply and whether different limits apply in different places.

Compare the limits with existing and planned barns, grain bins, homes, fences, windbreaks and trees at mature height. Ask who may trim or remove vegetation, who pays, whether notice is required, and what happens if an existing tree grows into a restricted area. Put any agreed exceptions and maintenance responsibilities in the documents for counsel to review; a verbal explanation may not resolve an unclear exhibit.

Review duration, enforcement and release

Section 5301.63 requires terms or conditions under which the easement is granted or may be terminated and a term stating that it runs with the land unless terminated according to its termination terms or otherwise agreed by the parties. Ask your attorney how the proposed wording affects a future sale, inheritance or financing. Do not assume that a project sale, equipment removal or the end of a lease automatically releases the easement.

Compare the proposed termination triggers with the project agreements: for example, failure to build by a stated date, permanent shutdown or removal. Ask who must sign and record a release, when that must occur and who pays. The statute also permits the benefited owner to seek equitable relief to prevent an obstruction described in the easement and an action for damages caused by it. Have counsel explain the proposed enforcement and dispute terms.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Gather the documents before deciding

Keep the proposed easement, all exhibits and amendments, deeds, survey or parcel map, project layout and any related option, sale or lease agreement together. Ask the developer to show the proposed restricted area and height limits on a drawing you can compare with your intended uses. Ask your attorney and surveyor which descriptions, exceptions, compensation and release terms need clarification.

Ohio law requires a solar access easement to be in writing and subjects it to the same conveyance and recording requirements as other easements. Ask your attorney about execution, recording and title consequences for your property. Sunland welcomes solar land sale, lease and existing project or agreement inquiries from owners and authorized representatives nationwide. Share the location, acreage if known and your relationship to the property; provide agreement documents privately if requested.

Questions landowners ask

Does an Ohio solar access easement restrict my whole parcel?

That depends on the proposed instrument and its property descriptions and restrictions. Compare the legal descriptions and exhibit with your deed and intended uses, and have counsel and a surveyor resolve uncertainty before signing.

Does the easement end when the solar lease ends?

Do not assume so. Review the easement termination language alongside the lease and ask counsel whether the documents provide for termination and a recorded release.

Can a solar access easement affect trees?

Section 5301.63 calls for limits on permissible development in terms of structures, vegetation, or both. Read the proposed restrictions to see whether and where trees are covered.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.