Draw the sale around the operation that remains
Overlay the proposed solar parcel and access roads on the permitted site plan. Show housing, design capacity by animal type, manure storage and treatment, transfer lines, drainage controls, equipment access and land used to apply manure. Include proposed property lines and who will own and control each parcel. Ask the operator, tenant and hauler which routes and areas they need through construction and afterward.
A partial sale may leave a working farm needing storage and application acreage, while a retirement may involve discontinuing the entire facility. Compare both the proposed sale and the farm’s actual operating plan with the permit. Gather the permit to operate or NPDES permit, any permit to install, approved plans, manure management and disposition records, tenancy documents and the project schedule. A surveyor and qualified farm or environmental adviser can help reconcile the maps before anyone promises exclusive possession.

Test whether capacity reduction ends required coverage
The rule’s paragraph C(3) applies to a narrow case: design capacity will be reduced so the facility no longer needs coverage under a permit to operate or NPDES permit, but no housing building or manure storage or treatment facility actually closes. The owner or operator must submit a closure plan for the director’s approval at least 90 days before that reduction and thereafter implement it. The plan includes best management practices and a detailed explanation of the reduction, its reason and assurance that it is intended to be permanent, plus necessary measures to prevent discharge of manure generated while the operation was a CAFO, subject to the rule’s agricultural stormwater exception.
If that closure includes transferring part of the facility to a different owner, the permitted facility owner must provide a revised site map showing new property lines and ownership of each parcel, a copy of any new deed, and documentation demonstrating why the facility after transfer no longer meets either the concentrated animal feeding facility (CAFF) or concentrated animal feeding operation (CAFO) definition. Prepare this evidence with the permit and proposed deed; ask the agency how to coordinate a deed that may not exist until closing. A smaller parcel or fewer animals on one day is not, by itself, that demonstration.
Check the whole facility and obtain the written outcome
Ohio’s definitions involve more than acreage. The statute describes an animal feeding facility by confinement and feeding conditions and includes controlled land where its manure is or may be applied. Facilities under common ownership can be treated as one when they adjoin or use a common manure disposal area or system. Species, capacity, designations and discharge circumstances matter to the CAFF and CAFO analysis. Have the agency and advisers assess the whole arrangement, including shared systems and retained or leased application land, rather than assuming a new property line changes the classification.
For permittees planning to end coverage, paragraph C requires a closure plan, written notice to the director and an opportunity for inspection to verify that a permit is no longer required and the facility is closed under the rule. Thereafter the director notifies the owner or operator in writing that the facility is closed. Keep that notice with the permit and closing records. A deed or the passage of 90 days is not that written outcome; the timing is specific to the applicable rule branch, not a universal solar-sale deadline.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landSeparate continued coverage from closing storage
If the farm will retain permit coverage while permanently closing all or part of a manure storage or treatment facility, paragraph D(1) provides a separate path. At least 90 days before closure, the owner or operator submits a closure plan for the director’s approval. It addresses best management practices, removing manure from discontinued portions, removing associated appurtenances and conveyances from discontinued liquid storage or treatment facilities, lawful application or disposal, and calculations of remaining storage and days of storage sufficient for compliance. The director may require plans and specifications for filling or demolition.
Paragraph D also calls for written notice and an inspection opportunity, followed by the director’s written closure notice. If the closure constitutes a modification under the rule’s definition, D(3) requires an application to modify the permit, remove closed portions and recalculate storage volume; an application for a permit to install is also required if applicable. Ask the agency whether the specific work triggers modification. Actual housing closure or closure of the entire facility can involve other branches, so do not substitute C(3) for those facts.
Make possession and responsibilities match the plan
Work backward from the proposed capacity reduction, review and construction dates. Identify who prepares the map and demonstration, submits the plan, manages animals and manure, pays for work, supplies the deed and retains agency correspondence. Set access rights for inspections, pumping and hauling, and specify when the buyer receives possession of each area. Address what happens if agency review requires a different boundary, additional work or a later date. Coordinate lender, tenant and operator rights with counsel; a private allocation of costs does not itself change regulatory duties.
Sunland welcomes land sale, lease and existing project or agreement inquiries nationwide. Share the property location, approximate acreage, proposed footprint and whether the facility will keep operating. Sunland may contract for a property and then assign the agreement to a specialist developer. Project interest and agency outcomes depend on the particular property and review.
Questions landowners ask
Does every Ohio solar sale require a 90-day closure plan?
No. The timing described here applies to particular events under rule 901:10-2-18, including the qualifying C(3) capacity reduction and D(1) storage closure. Confirm the permit, facts and applicable branch with the agency.
Does the sale itself end the livestock permit?
No. For a permittee planning to end coverage, the rule requires a closure plan, written notice and an opportunity for inspection; the director subsequently gives written notice that the facility is closed. Confirm the status of the actual permit with the agency.
Can a farm keep operating after selling acreage?
Possibly. Map the remaining operation, storage, application areas and access, then determine whether coverage remains required and whether the proposed work needs a closure plan or permit modification.
Sources & further reading
Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.