Compare the records with the proposed layout
Collect the option and all exhibits, a boundary survey, deed, mineral reservations or leases, and any well, plugging or access records. Ask the developer for a legible drawing of the proposed option area, array, fencing, construction areas and access routes. Mark known and suspected well locations and any discrepancies between records and what you can see on the property.
ODNR’s oil and gas well dataset includes well identifiers, locations and status fields, including orphan program status. Record the identifier and displayed status, and ask ODNR for underlying records and help reconciling a location question.

Investigate an uncertain location
A missing point does not establish that no well exists: well records may not capture every historic well. A mapped point also does not by itself establish the physical location for a solar design. Ask ODNR and qualified professionals how to reconcile historical records, field evidence and the proposed survey before fixing the layout.
Ohio law allows a landowner who discovers a well on their property, but does not own the well, to report it in writing to the division chief. For a written report of a well previously unknown to the division, the statute requires inspection within 30 days of receipt. Give ODNR the information you have and ask what further details it needs; do not assume a suspected well is already classified as orphan or ready to plug.
Ask about plugging and access before agreeing
Ask ODNR about the well’s status, investigation and any anticipated access or site work. Ohio law requires the chief to use a scoring matrix to prioritize plugging and restoration projects. That process does not establish a plugging date for this parcel. Ask the developer how the option schedule and exhibit will handle an unresolved location, investigation, plugging or restoration and later changes to the layout.
Ohio Revised Code section 1509.071 prohibits spending from the oil and gas well fund to remove a structure to access a well. Under the section’s state contracting provisions, contractor personnel may enter the well site or adjacent parcels needed for access after the chief gives specified written notice. Ask ODNR and the developer what working space and route may be needed, and ask your attorney how the proposed exhibit addresses access and costs.
Ohio also offers a landowner pass-through program for eligible wells. The statutory process includes an application, a proposed contract and approval; ask ODNR when work may begin. Ask ODNR about eligibility and responsibilities before committing to that route. Do not assume the program will pay for solar project changes or that eligibility or timing is guaranteed.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landResolve the option and existing rights together
With an Ohio attorney, compare the option and proposed exhibit with mineral rights, existing leases, easements and any well access or plugging documents. Ask who can enter, what routes and working space might be needed, who coordinates and pays for investigation or layout changes, and what happens if the well or access conflicts with the project. Have the developer identify any agreed changes in the documents for review before signing.
Sunland welcomes solar land sale, lease and existing project or agreement inquiries from owners and authorized representatives nationwide. Share the property location, acreage if known, your relationship to the property and whether a well is mapped or suspected. Provide agreements and well records privately if requested.
Questions landowners ask
Does an empty ODNR map prove there is no well?
No. Well records may not capture every historic well. Ask ODNR and qualified professionals how to investigate a suspected location.
Will ODNR plug a suspected well before the solar option deadline?
Do not assume a date. ODNR must investigate and determine status, and traditional program work is prioritized under the statutory scoring process. Ask ODNR about the specific well and address timing in the proposed option.
Can the landowner arrange plugging through Ohio’s program?
Ohio has a landowner pass-through program for eligible wells, with an application and approval process. Ask ODNR about the well’s status and program requirements before making commitments.