Pennsylvania landowner guide

Can a battery storage cable use Pennsylvania highway land?

A property’s frontage on a Pennsylvania state highway does not establish permission to put a battery storage cable in or across the highway right-of-way. Map the proposed route and ask who must obtain the applicable review before committing to it.

Could my land work?

Gather your survey, deed and known easements, then ask the developer and utility for a plan showing the proposed cable, crossing and connection. Ask the PennDOT district to identify the right-of-way information, appropriate permit or review, and responsible applicant for the actual proposal. Compare alternatives if the route changes.

Map the proposed route

Locate the battery site, highway, proposed cable and connection on the same plan. Ask the developer to distinguish a crossing from a route running along highway land and to show work areas and the proposed construction method. Mark uncertain boundaries and any other property crossed; a preliminary sketch is not a surveyed right-of-way or a grant of access.

Collect the deed, survey, easements and any relevant plans. Ask the PennDOT district how to obtain right-of-way information and have a qualified surveyor or other professional reconcile it with the proposed route. Private rights over other land may also need separate review.

Illustration of a land parcel and surrounding landscape

Identify the applicant and the review

PennDOT’s highway occupancy program covers different activities within state highway right-of-way, including utility permits for installation, repair or removal of lines and systems serving the public. The correct review depends on the facility and proposed work. Ask the district which permit or other process applies to this cable rather than assuming that a driveway permit or road frontage covers it.

For an application under Pennsylvania’s utility occupancy rule, if a party in the business of providing utility service owns, operates or intends to operate the facility, that party submits and executes the application in its own name, not a contractor or a person only served by the facility. If the facility owner is not in that business, the owner at the time of construction submits and executes it. Ask the developer, utility and PennDOT how the rule applies to the proposed cable and who would hold and comply with an approval. Take the proposed route and project description to the district contact and ask what plans, coordination and permissions are needed. A utility’s involvement or a submitted application is not an approval.

Compare alternatives and agreement terms

If the highway route is uncertain, ask the developer for an alternative and show the private parcels and other rights it would require. Request an explanation of who pays for design, permitting, construction, maintenance and restoration, including any changes required during review.

Have your attorney review the actual easement or project agreement, including the location and width of rights, access, restoration and what happens if the route or connection cannot be approved. Ask the developer and utility to confirm the connection separately; a mapped cable route does not establish available electrical capacity.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Prepare an inquiry

Sunland welcomes nationwide land and existing project inquiries. Share the location, your relationship to the property, approximate acreage if known, and whether a proposed cable may cross or occupy highway land. Provide plans and agreements privately if requested for review.

Questions landowners ask

Can a cable use the state highway right-of-way because the property has frontage?

Frontage alone does not establish permission. Show the route to the PennDOT district and ask which review and permissions apply.

Is the landowner always the permit applicant?

Do not assume so. Ask the developer, utility and district who should apply for the particular facility and who will hold any permit.

Does a highway permit confirm electrical capacity?

No. Ask the serving utility separately about the proposed connection and its review.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.