Compare the exhibit with available records
Gather the proposed solar lease exhibit, boundary survey, deed, mineral leases or reservations, well records and any correspondence about access or plugging. Ask the developer to show the proposed panels, fencing, roads and construction areas alongside any known or suspected well locations. A preliminary drawing does not establish a surveyed location or resolve existing rights.
DEP’s oil and gas mapping tool displays reported wells with location information. For abandoned, orphan and DEP-plugged wells, DEP gives filter instructions on its landowner page; record the displayed well name, permit number and status. DEP also describes historic farmline maps that may offer another research lead.

Treat a map as a starting point
An empty map is not proof that the parcel has no well. DEP says most legacy wells are not in its mapping tool because they predate modern reporting and are unknown to DEP. Its mapping application also cautions that its data may contain errors or omissions. Ask DEP and qualified professionals how to investigate a suspected location and reconcile records with field evidence.
If you discover a suspected legacy well, do not touch or modify it. DEP says to check its inventory and, if no well is inventoried nearby, use its abandoned well reporting form; its landowner page lists helpful location, equipment, photo and other details. DEP also notes reporting laws and a 60-day period. Contact DEP promptly about the specific discovery and applicable obligations.
Resolve layout and access questions
Ask DEP about the known or suspected well, its records and any next steps, and ask the developer how it will account for verification and any necessary access. Do not assume a mapped status establishes who is responsible for a particular well or that it can be covered by solar equipment.
With your attorney, compare the exhibit and proposed terms against recorded mineral rights, leases and access agreements. Ask who will arrange and pay for further investigation, how the layout may change, and what happens if the well or its access conflicts with the project. Preserve the actual documents for that review.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPrepare an inquiry
Sunland welcomes nationwide land and existing project inquiries. Share the property location, your relationship to it, approximate acreage if known, and whether a well is mapped or suspected. Provide agreement and well documents privately if requested for review.
Questions landowners ask
Does an empty DEP map prove there is no well?
No. DEP says most legacy wells are unknown to it and absent from the mapping tool. Ask DEP and qualified professionals how to investigate.
Can a solar project use land with an old well?
That depends on the well, existing rights, the proposed layout and relevant reviews. Verify the records and discuss the specific site with DEP, the developer and your attorney.
Should I move an old pipe to inspect it?
No. DEP advises landowners not to touch or modify a suspected legacy well. Contact DEP about the discovery.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.