Identify the field and the arrangement
With the farm operator, obtain the current approved Act 38 plan and field maps, applicable amendments and updates, field-use records and the farm lease or other permission to use the land. Ask the developer for a drawing and schedule showing panels, fencing, roads, trenches, construction and staging. Mark the fields and acres that would be unavailable or restricted, and when those changes would begin.
Determine whether the acreage is controlled and farmed by the operation covered by the plan, or belongs to a separate operation receiving exported manure. For an importer, review the relevant signed importer agreement, nutrient balance sheet or approved plan, and field maps. Section 83.301 addresses agreements for exports to known agricultural operations, including the importer’s authority to apply manure on rented or leased land; exceptions may apply. Ask the specialist to confirm how the land is represented in the records; ownership alone does not resolve which arrangement applies.

Ask which plan change is required
Under 25 Pa. Code 83.371, a plan amendment is required before specified significant changes in nutrient management are implemented. Listed triggers include certain changes in excess manure utilization arrangements and a net increase greater than 10% in animal equivalent units per acre. Fewer operator-controlled acres may affect that calculation; it is not the same as a 10% decrease in acreage. The regulation also addresses certified plan updates for other operational or computation changes. Losing acreage does not by itself tell you which provision applies; give the specialist the facts and ask the district about the required procedure and timing.
For a change in excess manure utilization arrangements, the regulation says no amendment is required to address the loss of an importer if that loss does not impair the operator’s ability to properly manage manure generated on the operation. Do not assume that exception applies to every loss of a field or importer. Ask the operator, specialist and district to assess the actual arrangement and any other changes or documentation requirements.
Coordinate the contracts and schedule
Compare notice, term, renewal and termination provisions in the farm lease and any importer agreement with the solar option and lease. Ask when the solar developer needs possession or access and whether construction, fencing or staging would remove fields from use before the operating project starts. Make the field map and timing specific enough for the operator and specialist to assess the proposed change.
Discuss any replacement acreage or altered agreements with the specialist and district before relying on them. A proposed replacement field is not automatically included in the approved plan or an importer’s documentation. Ask who will prepare and submit any amendment or update, who pays, and what must occur before the change is implemented.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landRecord the decision before committing land
Have the operator and specialist confirm the applicable plan documents and keep copies of district communications and approved amendments and copies of submitted updates. Ask your attorney to review how the solar documents address farm access, notice, timing, responsibility for plan-related work and what happens if the necessary changes are delayed or cannot be made.
Sunland welcomes land and existing project inquiries nationwide. Share the location, approximate acreage and your relationship to the property, and mention any known farm lease or nutrient plan issue. Provide farm records privately if requested.
Questions landowners ask
Does a solar lease always require an Act 38 plan amendment?
Not automatically. The result depends on the approved plan, field arrangement and changes proposed. Ask the certified specialist and conservation district to review the facts before implementation.
Does loss of a manure importer always require an amendment?
No. Section 83.371 says no amendment is required to address the loss if it does not impair the operator’s ability to properly manage manure generated on the operation. Other changes and documentation requirements still need review.
Can another field simply replace the solar acreage?
Do not assume so. The specialist and district should review the field, controlling agreements and any plan or nutrient balance sheet changes required before the change occurs.