Riverhead, New York · Battery storage

Can you lease part of your Riverhead farm for battery storage?

Sources checked

Where a Tier 2 battery project can go

Under Riverhead’s local Tier 2 battery storage review, a system proposed on a parcel with prime agricultural soils must fit on the nonprime portion. The Town Code separately excludes designated conservation areas, including property preserved through purchase of development rights. Have the project team show both boundaries on the same drawing before agreeing to a lease area.

A developer may offer to lease an unused corner so you can keep farming the rest. In Riverhead, that decision depends on the soil classification under the proposed system and any preservation restrictions on the land. Check both before you reserve acreage.

Match the soil map to the proposed layout

Start with your Suffolk County tax-map number and a survey. Use the Town’s zoning map to identify the district, then ask the Planning Department which zoning and review provisions apply to the proposal. Riverhead’s local Tier 2 process calls for a Town Board special permit and Planning Board site plan review in listed districts. The list identifies Agricultural Protection, which the district code calls the Agriculture Protection Zoning Use District (APZ).

In the USDA Web Soil Survey, draw an area of interest around the whole parcel. Save the Soil Map and the Farmland Classification map and table under Land Classifications in Soil Data Explorer. Keep the legends and any conditional classifications visible. Ask the project team to confirm with Planning what soil evidence and field verification it needs.

Ask the developer to overlay the mapped soil units on a dated plan showing the equipment, transformers, fences, driveways, utility routes and construction areas. Have the team identify any portion that crosses into prime soils and ask Planning how it treats each crossing. The provision addresses the location of the battery system. Get project-specific direction for roads, buried lines and temporary disturbances before agreeing to those rights.

Sources Riverhead Town Code § 301-283.31, Tier 2 permits and avoidance areas · Riverhead Planning Department, zoning maps and site plan forms · Riverhead Town Code Article VII, Agriculture Protection Zoning Use District · USDA Natural Resources Conservation Service, Web Soil Survey instructions

Check the preservation document and its map

Find out whether Riverhead, Suffolk County or another holder bought development rights or recorded another restriction on the property. Start with your deed and closing papers, then ask your title professional to check the County Clerk’s land records for the actual instrument and every referenced exhibit. Riverhead’s agricultural lands chapter sets out a purchase-of-development-rights process. The battery article lists conservation areas and properties preserved through purchase of development rights among its avoidance areas.

Give the restriction holder and the Planning Department your tax-map number and the proposed site drawing. Ask them to identify the protected acreage and confirm how they would treat a mapped exclusion, a reserved area or a crossing. If the instrument covers part of the property, have a surveyor place its legal description on the same drawing as the proposed battery site. Locate the recorded boundary before relying on a fence line or a mark on an online map.

Sources Riverhead Town Code § 301-283.31, Tier 2 permits and avoidance areas · Riverhead Town Code Chapter 201, acquisition of development rights · Suffolk County Clerk, recorded land records search

Decide whether the layout is ready to use

Work through the proposed lease area and every right the developer wants outside it. These examples show how the same parcel could get different answers depending on the drawing and title records.

What the drawing or records showWhat to ask for before signing
The developer’s pad crosses a mapped boundary between prime and nonprime soil.Ask for a revised layout and confirmation from Planning on what it will accept as the soil boundary.
The proposed site is on nonprime soil. A recorded development-rights instrument includes the same ground.Ask the holder, your title professional and Planning to review the instrument and exhibit before treating the area as available.
The battery pad sits on the nonprime corner. The cable route or driveway crosses a preserved field.Show that route separately on the drawing. Ask which property rights and reviews apply, and have the developer price a route outside the restricted field.
The proposed pad sits outside the prime soil and preserved areas. The driveway cuts across the farm’s only harvest access.Ask the developer to draw a route and turning area that keep the farm operable. Put any shared access or construction limits in the land agreement.

Sources Riverhead Town Code § 301-283.31, Tier 2 permits and avoidance areas · Riverhead Town Code Chapter 201, acquisition of development rights

Keep the farm’s access and acreage on the lease exhibit

Compare the same plan revision across the application, land option and proposed lease. Riverhead calls for property-owner consent in the Tier 2 submission. Before signing, ask your adviser to check exactly which plan, land and use the consent covers. Mark the equipment parcel or lease area, any permanent or temporary access rights and the fields that remain available to your operation.

Walk the plan with the farm operator. Mark gates, routes wide enough for farm equipment, shared driveways, irrigation lines and drainage crossings. Ask who repairs damage to each and when farm access must be restored after construction. If another operator farms the site under a lease, bring that lease and the proposed drawing to your adviser so the operator’s rights are accounted for.

If the project needs time to establish the soil or preservation boundaries, discuss an option milestone tied to a revised exhibit and written evidence from the relevant office or holder. Decide how long the developer can hold the proposed area, and which acreage or access rights fall away if the layout fails review. If equipment or access moves onto another part of the farm, ask for a revised site plan and lease exhibit before authorizing the change.

Sources Riverhead Town Code § 301-283.31, Tier 2 permits and avoidance areas · Riverhead Planning Department, zoning maps and site plan forms

Common questions

Does a parcel with any prime soil have to be ruled out?

Section 301-283.31(D)(3) allows the soil restriction to be met by placing the system on the parcel’s nonprime portion. The eligible district, other avoidance areas and both Town reviews still apply.

Does a nonprime corner clear a farmland preservation restriction?

The Town Code checks designated conservation areas separately. Find the preservation instrument and ask the holder and the Town how the actual boundary applies to the layout.

Which drawing should I ask for first?

Ask for a dated plan with the parcel survey, the soil map, any recorded preservation boundary and all proposed roads, cables and work areas. Use that plan to identify what you may be asked to lease or grant.

Sources

The Town Code identifies the Tier 2 avoidance areas. Ask the Riverhead Planning Department which evidence it will accept for the specific parcel and layout.