Landowner guide

Who can authorize SDG&E meter data for a battery storage screening?

A commercial battery storage screening may begin with a request for interval electricity-use data. Before authorizing its release, identify the customer of record, the meters being evaluated and the recipient. The building owner and utility account holder may be different people.

The short answer

Confirm who holds each SDG&E account and which meters serve the proposed behind-the-meter project. Ask the screening provider exactly what data it needs, for which period, who will receive it and how long authorization lasts. The account holder can review SDG&E’s Green Button Connect or Consent to Share options and authorize the appropriate limited scope through SDG&E’s process. Never share account login credentials.

Identify the account holder and meters

Compare the proposed project location with the service addresses and meters that supply the commercial operation. A tenant may be the customer of record even when the property owner controls the building. In that case, involve the tenant and confirm who is authorized to act for the account before requesting its data.

Ask the provider why each account or meter is needed and what time period and interval data it will use. Avoid sending bills, account numbers or usage files through an informal channel. The account holder can handle account-specific information directly through SDG&E’s process or another verified secure channel.

Illustration of a land parcel and surrounding landscape

Review the recipient and authorization scope

SDG&E describes Green Button Connect My Data as a way for residential and business customers to authorize third-party vendors to receive energy-use information through My Energy Center. Ask whether the intended recipient can use that route and review the recipient, information shared, duration and applicable terms before the account holder authorizes it. The account holder should sign in directly; SDG&E says not to give login information to anyone else.

A Letter of Authorization is another SDG&E process that can authorize data sharing or certain actions. Read the actual form carefully: access to usage data and authority to make account or rate changes are different choices. For non-standard forms, SDG&E lists the customer of record, service accounts and address, recipient, specific authorized information or actions, signatures and authorization timeframe among its submission requirements. Use only the scope needed and ask SDG&E if the form or process is unclear.

Keep screening separate from project commitments

An authorization to share usage information does not itself establish site control, authorize physical work or grant permission to modify an account. Review any lease, equipment access and project documents separately with the parties whose rights are involved. Ask the provider how to end or revoke the data authorization and what it will do with data already received.

Interval-use data can help a provider evaluate a potential project, but sharing it does not establish available electrical capacity, an approved connection or expected savings. Ask for assumptions and a written screening explanation, then confirm any proposed project and utility requirements through the appropriate review.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Prepare an inquiry

Sunland welcomes nationwide land and existing project inquiries. Share the general property location, your relationship to it and whether the proposed site is occupied. Do not send login credentials, account numbers or private usage data in an initial inquiry; discuss a secure process with the authorized account holder if detailed data is needed.

Questions landowners ask

Can a building owner authorize a tenant’s SDG&E data?

First identify the customer of record and who is authorized to act for that account. Involve the tenant when it holds the account and follow SDG&E’s authorization process.

Does data authorization allow a provider to change the account?

Not automatically. SDG&E authorizations can cover different information and actions. Review the specific form and authorize only the intended scope.

Does sharing usage data guarantee battery savings or capacity?

No. It can inform screening, but results depend on the project and its assumptions; electrical capacity and any connection requirements need separate review.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.