Find the actual overlap
Ask the solar developer for a mapped route showing the permanent road, clearing width, shoulders, drainage, utility crossings, turnarounds, temporary access and staging. Compare it with the current forest project boundary and inventory maps, property lines and existing easements. Field-check the route and any alternate access that could avoid or reduce disturbance. An access easement outside the panel lease can still affect the offset project.
Identify the offset project name and ID, forest owner, offset project operator or authorized project designee, registry, project type and status. Request the listing documents, applicable protocol vintage, latest verified data reports, carbon inventory and management plan, and any recorded restrictions or private carbon agreements. CARB says approved registries list proposed compliance projects; CARB’s issuance data identifies projects issued ARB offset credits. A private registry listing or voluntary credit alone does not establish that the project participates in CARB’s compliance program.

Assess clearing and ongoing obligations
Ask the operator and a qualified forest carbon professional to model the full proposed disturbance and maintenance, including repeated vegetation control, against the project’s baseline and current carbon stocks. Have them identify monitoring, reporting and verification implications, any required notices or approvals, and whether a revised layout could avoid adverse effects. Do not assume that removing a few trees automatically creates a reportable reversal or that a small road has no effect.
Under the 2015 CARB forest protocol, project life generally requires continuing monitoring, reporting and verification, with defined exceptions. A reversal is a carbon accounting determination, not simply a tree count. The protocol distinguishes intentional and unintentional reversals; compensation and project continuation or termination depend on the facts and applicable regulation. The forest buffer account addresses qualifying unintentional reversals, so do not assume it covers planned clearing or the agreement’s financial liabilities.
Review transfers and allocate the risk
A road easement, solar lease, land sale, transfer of timber rights and assignment of a project agreement are different transactions. Have counsel examine the deeds, carbon contracts, access rights and proposed documents together. Under the 2015 protocol, a sale of project land or timber rights to an entity that does not elect to take over project responsibilities and commitments automatically terminates the project, with required retirement of credits under the protocol. Do not assume that an easement or lease has that same result; obtain a project-specific determination.
Before granting possession or agreeing to a route, put any required consents and review steps into the agreement. Specify who pays for mapping, carbon analysis, verification, notices, compliance instruments and other losses; who controls construction and maintenance; and what happens if the route changes, an approval fails or a reversal is determined. Address any assignment and successor obligations with the operator and counsel.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landUse the applicable rules
CARB lists 2011, 2014 and 2015 U.S. forest protocol versions. Projects listed on or after November 1, 2015 use the 2015 protocol; confirm the version and any transition for an existing project rather than assuming every project uses it. CARB’s 2026 Cap-and-Invest amendments took effect September 1, 2026. Check the current regulation and project-specific documents with the operator and CARB, including the status of any later proposed protocol changes.
CARB’s forms page provides listing and other program forms, and notes that the forest reporting forms shown were designed for the 2011 and 2014 protocols, not the 2015 protocol. Confirm current submission requirements with CARB or the registry rather than using an older form as proof of current obligations.
An owner or authorized representative can ask Sunland to screen land for a solar sale or lease or submit an existing project or agreement for review. Share the approximate location, proposed access and known carbon commitments; keep sensitive project documents with the appropriate advisers.
Questions landowners ask
Does a road through a forest project automatically cause a reversal?
No. A reversal depends on carbon accounting under the applicable protocol and regulation. Ask the project operator and a forest carbon professional to assess the complete footprint and proposed work.
Will the forest buffer account pay for planned clearing?
Do not assume so. The buffer account addresses qualifying unintentional reversals; the classification, compensation and contractual liability require a project-specific review.
Does selling the land end the project?
Under the 2015 protocol, sale of project land or timber rights to an entity that does not elect to assume project responsibilities and commitments automatically terminates the project and triggers required credit retirement. Review the applicable protocol and transaction with counsel.
Sources & further reading
Sources checked 2026-11-17. Local rules and program details can change. Check the requirements for the actual project.