Identify the strip and who can use it
Map the runway, landing and takeoff areas, taxiing space, hangar or tie-down, ground access and any adjoining land needed for operations. Ask the person who actually operates the strip about recent use, aircraft, users and seasonal activity. Check the FAA airport record if there is an identifier, but do not treat an absent or outdated listing as proof that a strip is inactive. The FAA describes how to obtain an airport master record through its Airport Data and Information Portal.
Review deeds, surveys, leases, easements, permissions and any airport agreements with counsel. A neighbor, tenant or flying club may have rights or practical reliance that the landowner must address. Confirm whether the facility is private-use or public-use and whether any federal agreement applies. This decision concerns a landing area on the offered land; glare or airspace review for a separate nearby airport is a different question.

Choose retention or deactivation before committing the field
If flight use must continue, show the developer the mapped strip and access early. Ask the operator and qualified aviation advisers to assess the proposed panels, fencing, roads, wires, equipment and construction staging in relation to actual operations. Reserve the necessary area and access in the site plan and agreement, including construction controls and responsibility for maintenance. A retained runway is not automatically compatible with a solar layout merely because panels are outside the runway footprint.
If the strip cannot reasonably remain usable, agree with the operator on when flight operations stop and how users will be informed. Check property rights and any federal, state or local obligations before making the landing area unusable. Confirm with the FAA and state aviation office what notices, records and physical closure measures are appropriate for this particular site. Do not place obstacles or allow construction to begin on an area still being used for landing.
Check the federal notice rules for the actual action
Under 14 CFR Part 157, an airport includes an aircraft landing or takeoff area, and private use is not itself an exemption. Section 157.3(c) addresses deactivation, discontinued use or abandonment of an airport or landing or takeoff area for one year or more. Section 157.1 excludes certain projects, including some short-duration or intermittent VFR sites and airports subject to a federal agreement requiring an approved current airport layout plan on file with the FAA. An exclusion from Part 157 does not establish that other obligations do not apply. Ask the FAA which rules govern the facts.
For a covered deactivation, § 157.5(b)(2) permits notice by letter and says prior notice is not required except that 30 days’ prior notice is required when an established instrument approach procedure is involved or the affected property is subject to an agreement with the United States requiring it to be maintained and operated as a public-use airport. The general 90-day advance provision for certain airport projects is subject to this deactivation provision; do not assume a generic construction deadline controls this closure. Confirm the procedure and timing with the appropriate FAA Airport District/Field Office or Regional Office.
For an airport project covered by Part 157, § 157.9 requires the proponent to notify the FAA Airport District Office or Regional Office within 15 days after completion, using FAA Form 5010-5 or a letter. Agree who will submit any applicable notices, keep copies and confirm the status of the airport record. FAA guidance also directs sponsors to contact the relevant FAA office and state aviation office about the steps and applicable state and local rules.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landMake delivery obligations concrete
Attach a dated map showing the retained area or the area to be deactivated. Set a delivery date tied to specific steps: resolution of operator and user rights, any required notices and completion reporting, communications to users, and agreed physical closure or safety measures. Identify who pays for those steps, who can enter the land to perform them, and what happens if an agency response or a rights dispute delays delivery. Have local counsel draft the conditions to fit the transaction; an FAA record update alone does not terminate private rights.
Sunland welcomes solar land sale, lease and existing project inquiries nationwide. Share the property location, approximate acreage, strip location and whether continued flight use is important. Keep personal and aviation records private until needed for review.
Questions landowners ask
Does a private airstrip automatically avoid FAA notice?
No. Private use alone is not an exemption. Applicability and the proposed action matter, so consult the FAA about the site and Part 157.
Is 90 days of advance notice always required to close the strip?
No. For covered deactivation, § 157.5(b)(2) generally does not require prior notice, but requires 30 days in the specified instrument-approach or federal public-use agreement circumstances. Confirm the facts and procedure with the FAA.
Can the landowner keep using the runway after leasing the field?
Potentially, if the parties can preserve the necessary land, access and safe operation. Have the operator and qualified advisers assess the layout, and document the retained rights and construction controls.
Sources & further reading
Sources checked 2026-11-16. Local rules and program details can change. Check the requirements for the actual project.