Landowner guide

Can a farm remainder sale for solar qualify for Section 1033 gain postponement?

After a public taking removes part of a working farm, the owner may consider selling the remainder to a solar buyer and relocating. Federal tax rules can sometimes allow gain on a qualifying related voluntary sale to be postponed, but the taking and the solar offer alone do not establish that result.

The short answer

Gather the condemnation award, maps, operating records, basis and proposed sale terms before committing. Ask a tax adviser to determine whether the condemned and remaining property formed one economic unit, whether the condemned property could reasonably or adequately be replaced, and whether the proposed replacement and election qualify. Compare the combined replacement cost and actual deadline with the sale terms and the alternative of retaining the farm.

Start with the completed taking and the farm

This guide addresses an actual qualifying partial condemnation followed by a proposed voluntary sale of economically related remaining property. Obtain the petition, judgment or conveyance, acquisition plan, settlement and payment records. Identify the interest taken, the dates and the exact property remaining. An inquiry, a solar option or a proposed lease is not automatically the completed condemnation or qualifying sale described here.

Draw the former farm and the remainder, including fields, buildings, access, irrigation, drainage and utility routes. Document what the taking changed and what remains usable. A narrow strip or easement does not necessarily make the farm unusable or make a later private sale qualify. Ask eminent-domain counsel and a tax adviser to assess the actual rights and facts.

Illustration of a land parcel and surrounding landscape

Test the relationship and ability to replace

IRS Publication 544 describes treatment for a related voluntary sale when the condemned property and the property sold had a substantial economic relationship as one economic unit and the condemned property could not reasonably or adequately be replaced. The adviser must examine the actual use and relationship, not merely whether two tracts share an owner or tax parcel.

Collect farm operating plans, crop and irrigation records, maps, access agreements, engineering assessments and evidence of alternatives to replacing the taken part. For example, if a taking cuts through a working irrigation system, determine whether a practical replacement, reroute or other arrangement is available and at what cost. A solar buyer’s interest or a favorable price does not prove that the statutory conditions are met.

Compare retaining the remainder with selling it

Ask the farm operator and advisers to compare restoring access or operations, obtaining suitable nearby property, retaining a smaller farm and selling the remainder. Include practical access, water, equipment, working capital, timing and the expected tax treatment of each alternative. Publication 544 discusses circumstances in which restoration costs or nearby replacement property may be relevant; qualification and amounts require individual review.

A sale to a private solar buyer is a separate transaction from the public award. Obtain a complete purchase offer, legal description, access and utility rights and any proposed possession schedule. An option or lease is a different interest; do not assume it receives the same treatment as a qualifying related sale. The land and project also need their own title, access and approval reviews.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Calculate the combined replacement cost

For full postponement of gain on a qualifying related sale, Publication 544 states that replacement property must cost at least the amount realized from the sale, plus the net condemnation award if it resulted in gain, plus net severance damages if they resulted in gain. Reinvesting only the gain, or only the solar sale proceeds, may be insufficient. Ask the adviser to identify the actual amounts and how expenses and basis affect the calculation.

Gather records of the award, separate severance damages, legal and other expenses, sale price and costs, and basis in the taken and retained property. If the qualifying replacement cost is less than required for full postponement, some gain may be recognized. Ask for a written comparison of the estimated tax, purchase costs and cash needed under each scenario; do not count the entire award as freely available cash without that analysis.

Choose replacement property and track the correct deadline

Replacement property must meet the applicable requirements and be acquired for the purpose of replacing the converted property. Ask the adviser how the nature and use of the condemned property affect the replacement test, and review any related-party restrictions before negotiating with a family member or affiliated entity. A promising parcel is not automatically qualifying replacement property.

For qualifying condemned business or investment real property, the replacement deadline is generally three years after the end of the first tax year in which any condemnation gain is realized, subject to applicable rules and exceptions. It is not automatically three years after the later solar closing. An advance or partial payment can matter before the final award; give the adviser the full payment timeline and ask for the actual deadline and any extension procedure.

Plan the election, basis and reporting

Postponement requires the applicable election and reporting; it is not automatic. Ask the tax adviser which taxpayer owns the condemned property and must make the election, what statement and return are required, and how to report the award, related sale and replacement. If a company owns the property, its identity and return matter. Preserve filings and advise the preparer if plans or amounts change.

Postponing gain is deferral, not forgiveness. The replacement property’s tax basis and a later sale can affect future tax, and other gain or depreciation issues may need separate analysis. Section 1033 has its own rules: do not assume that a Section 1031 qualified intermediary or its 45- and 180-day deadlines automatically govern this condemnation election.

Make the property agreement fit the decision

Discuss the election and replacement search before agreeing to a solar closing date. Have counsel address the exact land and rights sold, survey, access, any remaining easements, due diligence and what happens if financing or necessary approvals are unavailable. Coordinate with the tax adviser if the date, buyer or property changes; a private contract does not itself establish tax qualification.

Sunland welcomes nationwide solar land sale, lease and existing agreement inquiries from owners and authorized representatives. Share the location, approximate acreage, the completed taking and the proposed remainder, while keeping sensitive award and tax records private until needed. Sunland may contract for a property or agreement and then assign its interest to a specialist, subject to actual terms and required consents.

Questions landowners ask

Does a partial taking automatically qualify a later solar sale for Section 1033?

No. The related property and taking must meet the applicable conditions, including the economic relationship and inability reasonably or adequately to replace the condemned property. Ask your tax adviser to assess the evidence.

Must I reinvest only the gain to postpone all gain on a qualifying related sale?

No. Publication 544 describes a combined replacement-cost measure using the sale amount realized, net condemnation award if it resulted in gain, and net severance damages if they resulted in gain. Have an adviser calculate the actual amounts.

Does the replacement period start when the solar sale closes?

Not automatically. For qualifying condemned business or investment real property, the replacement deadline is generally three years after the end of the first tax year in which any condemnation gain is realized, subject to applicable rules and exceptions.

Does postponing gain eliminate the tax permanently?

No. Postponement affects current recognition and generally affects replacement basis. Ask your adviser about a later disposition and the actual tax consequences.

Sources & further reading

Current section 1033 and IRS Publication 544 checked November 18, 2026. No individual condemnation, award, sale or replacement was reviewed. A qualified tax adviser should assess current law and the actual facts. Local rules and program details can change. Check the requirements for the actual project.