Find the election and map the affected land
Ask the executor or estate adviser for the filed Form 706, the section 2032A election, agreement and property descriptions, and any amendments or later correspondence. The current IRS Form 706 instructions use Schedule T for section 2032A; older returns may use a different schedule. Inheritance or agricultural use alone does not establish that an election was made.
Compare the elected legal description and survey with the proposed solar area, access road, cable corridor and any retained farm land. Note the date of death, identity of each qualified heir and ownership changes. The estate election may cover only part of a parcel, so do not rely solely on a tax map or acreage figure.

Review the stages before granting rights
Give counsel the option, proposed lease or deed and a timeline for entry, possession, construction and closing. Document who currently farms each area and when actual use might change. An option, investigation right, lease, easement or sale may have different consequences; neither a signature nor continued ownership alone answers whether qualified use has ceased.
The IRS generally describes a taxable event as a disposition or cessation within 10 years after the decedent’s death and before the qualified heir’s death. The two-year grace period for commencing qualified use can extend the 10-year period by the time between death and commencement. Ask the adviser to calculate the applicable period and assess material participation, qualified use, possible exceptions and the specific disposition or cessation date. Do not assume a small sale is free of consequences or that all elected acreage is affected. IRS instructions say recapture is limited to tax savings attributable to the property disposed of or for which qualified use ceased.
Plan around any filing and lien
The IRS states that a qualified heir must file Form 706-A for a taxable event even if no tax is ultimately due, and generally file and pay within six months of the taxable disposition or cessation unless an extension is granted. Have a qualified adviser determine whether a filing is required and calculate any amount; family transfers and other exceptions have their own conditions.
The election creates a special federal lien on specially valued property. Ask counsel and the title company to identify it and discuss any release or security requirements before setting a closing date. Put responsibility for records, professional costs and transaction contingencies in the proposed agreement.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landBring the proposal and records together
Keep the estate return and election, legal description, survey, farm records and proposed project footprint together. Ask the developer to describe the rights needed at each stage and allow time for estate and tax review before irrevocable commitments.
Sunland reviews solar land for sale or lease and existing project rights nationwide. An owner or authorized representative can share the location, approximate acreage and the known estate issue; sensitive tax records can be shared privately if requested.
Questions landowners ask
Does inheriting farm land mean section 2032A applies?
No. Review the estate return and election to determine whether the property was specially valued.
Does a solar lease automatically trigger recapture?
The result depends on the elected property, rights granted, actual use and applicable rules. Ask estate counsel and a tax adviser to assess the specific proposal.
Can I sell only a small strip?
A partial disposition still requires review. The IRS limits recapture to the tax savings attributable to affected property, subject to the applicable rules.