Locate the enrolled acreage
Collect the CRP contract and amendments, the conservation plan, the map identifying enrolled fields or practices, and the contract expiration date. Identify the participant and any tenant or other person involved in managing the land. If records are incomplete, ask the local FSA office for help identifying the contract and acreage.
FSA describes CRP as a conservation program with several enrollment options; contracts are typically 10 to 15 years. The actual agreement and practice matter more than a general program description.

Put the proposal on the same map
Ask the developer for a preliminary drawing of panels, fencing, equipment, access, construction staging and cable or utility routes. Compare that drawing with the CRP map, including buffers or other enrolled strips. Mark overlaps and areas where the proposed route is still unknown; an initial sketch is not a final survey.
If the developer proposes only the unenrolled portion, ask whether construction traffic, grading, drainage changes or a utility route would touch enrolled land. Identify who can answer these questions before granting access.
Ask FSA before changing use
Take the contract, map and proposal to the local FSA office. Ask whether the proposed option, access, studies or construction would affect the contract; what approvals or changes, if any, are available; and whether repayment, other costs or timing restrictions could apply. Ask FSA to explain the answer for the specific enrolled practice and proposed activity.
Federal CRP rules provide for a participant to request voluntary termination in writing, in whole or in part, and obtain Commodity Credit Corporation approval; a decrease in enrolled acres is treated as a partial termination. Ask FSA about potential repayment or other costs for your circumstances. Your attorney can review the proposed site-control documents and consequences for your transaction.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landCoordinate dates and responsibilities
Compare any proposed option, access and construction dates with the contract expiration date. Ask the developer to specify who will seek information or approvals and who bears any agreed costs or delays. Have counsel review those terms before signing; a future expiration date alone does not settle what activity is allowed beforehand.
Sunland welcomes nationwide inquiries about land and existing project agreements. Share the location, your relationship to the property, approximate acreage if known and whether CRP enrollment overlaps the area under consideration. Send contract documents privately if requested for review.
Questions landowners ask
Does a solar option automatically cancel a CRP contract?
Do not assume it does. Ask the local FSA office about the proposed agreement and the actual CRP contract before signing.
Can I offer only the land outside CRP?
You can ask a developer to evaluate that area, but check whether roads, construction, drainage or cables would affect enrolled acres too.
Who can explain the contract requirements?
Start with the FSA office administering the contract and bring the contract, conservation plan, maps and proposed activity.
Sources & further reading
Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.