Find the repair and its remaining lifespan
ECP helps eligible producers repair qualifying disaster damage to farmland and address severe drought. Examples include restoring permanent fences or water conservation structures. Identify the recipient of cost-share assistance, who now owns and operates the land, the disaster date, the approved work and exactly where it was performed. A tenant and the owner may be different people; involve the participant in discussions with FSA.
Request the signed agreement and amendments, FSA-801C and supporting records, practice writeup, completion and payment records, maps and maintenance requirements. Under FSA handbook 1-ECP Revision 8, applicable to eligible disasters beginning October 1, 2023, the lifespan is specified in the practice writeup and begins January 1 after the calendar year of installation. Older disasters use different handbook revisions. Ask the county office which rules and dates apply to this repair instead of assuming all practices have the same term or that payment ended the obligation.

Compare the whole solar footprint with the repair
Overlay panels, roads, fences, buried lines, drainage changes, temporary workspace and access routes on the practice map. A restored water-control structure may need access and continued function beyond its physical footprint; a repaired fence may be affected by a new entrance. Ask FSA whether the proposed work and future use would allow the practice to be maintained and used for its approved purpose, and what evidence or written determination it needs.
Avoidance or a changed layout may be possible, depending on the facts. A developer’s promise to repair or replace a feature later does not by itself establish that the ECP requirements are met. Do not assume that solar is prohibited across the entire parcel or that all work outside the mapped feature is automatically clear.
Resolve control and a successor undertaking
Provide FSA the actual proposed option, entry, lease, easement or purchase terms and ask whether and when they change control or title. Rights can differ even when documents have the same name. If control or title is relinquished, Revision 8 paragraph 433B directs the participant to obtain a written statement from the new owner, operator or both agreeing to maintain the practice for the remaining specified lifespan. The statement is attached to the original FSA-801C; the handbook describes how responsibility shifts after it is obtained. Ask FSA who must sign, how to document the arrangement and whether the proposed party can undertake the required maintenance.
The same paragraph says that if the statement is not obtained, a refund is prorated and collected from the original participant based on the practice’s lifespan and age at the ownership or operatorship change. Separately, 7 CFR 701.37 addresses voluntary or involuntary loss of control: if the acquiring party elects not to become a successor and the practice is not maintained, each cost-share recipient may be jointly and severally liable for repayment. Ask FSA how the regulation and the applicable handbook and agreement apply to the actual facts; do not assume a lease automatically transfers the obligation or that a private indemnity releases a participant.
Want to ask about your land?
Send the location and what you know. You don’t need a project plan.
Tell us about your landPlan for maintenance, damage and potential repayment
Under 7 CFR 701.31, a recipient is responsible for required maintenance and proper use, and may have to refund all or part of the assistance if a practice is not properly maintained for its established lifespan. Revision 8 paragraph 706 describes violations that can include substantial damage, destruction or stopping use before the lifespan ends. It describes recovery of cost-share on the portion not properly maintained, with a possible partial refund if the county committee determines a total refund is not justified. Exceptions and nonviolation determinations depend on the circumstances, including some events beyond the producer’s control and certain involuntary losses of control.
Before granting entry, ask FSA for a site-specific assessment of maintenance, any corrective work and potential repayment. Agree in the transaction documents who pays for required work, repairs, professional advice and any assessed repayment; address access for maintenance, timing, security and assignment of project rights. Keep dated photos, maps, written agency correspondence and records of payments and work. A negotiated cost allocation does not replace FSA’s determination.
Check other agreements separately
ECP disaster-repair cost share is distinct from an NRCS EQIP or CSP contract and from a conservation easement. More than one obligation may apply to the same land. Review each agreement with the responsible agency and your advisers before construction or a change in control.
Sunland welcomes solar land sale, lease and existing project inquiries nationwide. Share the location, approximate acreage and whether a disaster-repair agreement may apply. Sunland may contract for a parcel and then assign the opportunity to a specialist; identify the party responsible for commitments in the actual documents. Keep sensitive financial and agreement details private until needed for a secure review.
Questions landowners ask
Does an ECP payment prohibit solar on the entire farm?
Not automatically. Locate each cost-shared practice, confirm its lifespan and compare its function and maintenance needs with the complete proposed footprint. Ask FSA to assess the specific proposal.
Does a solar lease automatically transfer the maintenance duty?
No. Ask FSA how the specific rights affect control and how to document any successor undertaking. The handbook procedure and regulation address different consequences when control changes.
Is repayment always the full amount received?
No. The applicable rules distinguish the circumstances and may provide for partial or prorated recovery, exceptions or other determinations. Ask FSA to assess the agreement, practice and proposed transaction.
Sources & further reading
Sources checked 2026-11-18. Local rules and program details can change. Check the requirements for the actual project.
- FSA: Emergency Conservation Program
- FSA: 1-ECP Revision 8, Amendment 1, paragraphs 123, 433, 680 and 706–707
- FSA: handbook index and disaster-date revisions
- 7 CFR 701.31: Maintenance and proper use of practices
- 7 CFR 701.37: Loss of control during the practice lifespan
- 7 CFR 701.36: Actions defeating program purposes