Can a solar project use land under an FSA debt-reduction conservation contract?

A farm owner may have reduced an FSA loan years ago by placing part of the property under a conservation contract. If a solar proposal now includes that land, the relevant question is not just whether the loan has been paid: the contract and its management plan may still restrict development on the designated acres.

The short answer

Obtain the signed conservation contract, legal description, boundary map and management plan, and compare them with every part of the proposed solar project. Ask the FSA servicing office for a written, site-specific review before granting entry or promising construction rights. Consider a layout outside the contract area and make agency review, remaining obligations and transaction deadlines clear in the sale or lease.

Identify the agreement and its remaining term

This guide concerns an FSA Farm Loan Program conservation contract accepted in exchange for debt reduction. It is different from an EQIP practice contract, a shared appreciation agreement or an ordinary mortgage. Similar conservation language can appear in several USDA programs, so ask FSA to identify the agreement if the paperwork is unclear.

Find the executed FSA-2535 or other actual contract, its attachments, management plan, recording information, any amendments and correspondence. FSA’s handbook describes attaching a legal description and a boundary map or marked aerial image to FSA-2535. Ask FSA and the title company for missing material, the effective date, applicable term, affected acres and current enforcement or management contact. Compare the signed documents and title records with the land offered; do not infer the boundary from a farm or parcel number alone.

Under 7 CFR 766.110, contract terms may be 10, 30 or 50 years. The 2019 FSA fact sheet describes development and construction as generally prohibited on contract areas, with certain compatible uses potentially allowed to protect and enhance the conservation values. The actual agreement and management plan need review. Paying off a remaining loan or releasing a mortgage does not by itself establish that a separate conservation contract has ended.

Illustration of a land parcel and surrounding landscape

Map the entire project against the protected area

Give the developer and surveyor the contract description, map, management plan and current survey. Request a scaled overlay of the protected boundary and the proposed purchase or lease area, panels, inverters, fencing, grading, drainage, roads, gates, turning areas, temporary laydown and staging, trenches and electrical routes. Show the public-road and grid connection routes, including any land outside the parcel.

Consider construction, operation, repairs and removal, not only the panels. A cable trench or widened access road through a protected strip can create a separate issue even if the array is outside it. Mark uncertain boundaries and ask the surveyor and FSA what information would clarify them. Conversely, a contract covering one part of a larger farm does not automatically establish a restriction on every other acre; check the documents and other applicable rights.

Ask FSA about the specific proposal

Send the local FSA servicing office the signed contract and plan, dated overlay, draft option, sale or lease and easement exhibits, and a description of the proposed work, traffic, timing, vegetation changes, drainage and restoration. Identify the owner, original borrower if different, proposed buyer or lessee, and any known manager of the contract. Ask which activities and locations conflict with the existing terms, what information FSA needs, and whether the proposed work can be undertaken under the contract.

Request the agency’s response and any conditions in writing, and keep the reviewed drawing with it. If the developer changes a road, trench or project boundary, ask whether FSA needs to review the revision. Do not assume that repayment of the original debt reduction, a restoration promise or a requested amendment buys permission to build; the regulation and actual agreement govern, and no amendment or approval is guaranteed.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Understand a transfer and a breach

Under section 766.110(k), if the borrower or a subsequent landowner transfers title, the conservation contract remains in effect for the duration of its term. FSA’s fact sheet says the borrower must ensure a purchaser knows of the contract and that its terms remain binding on subsequent owners. Give the buyer and title company the documents early and have counsel address disclosure, continuing access, management duties and the affected acreage. A sale does not itself remove the restriction.

Section 766.110(n) states that a borrower or subsequent owner who fails to comply must restore the land to compliance with the contract and management plan within 90 days. If cure is not completed, consequences differ: FSA may reinstate cancelled debt with interest, assess 25% liquidated damages and enforcement expenses against a borrower who had the debt exchanged for the contract. The rule requires a subsequent breaching owner to pay the cancelled debt amount, interest at the non-program rate, 25% liquidated damages and enforcement expenses. Ask counsel and FSA about the actual facts; do not treat damages as a negotiated development price.

Section 766.110(m) also addresses lien priority: prior liens must be subordinated to the conservation contract, and the agency will not subordinate it to other lenders’ or governmental entities’ liens. Ask the title company and counsel how the recorded interests affect this transaction rather than assuming a new lender or buyer can take priority.

Structure the project and transaction around the review

Ask for an alternative layout that avoids the protected acreage, including temporary work and access, and confirm whether other rights are needed for that route. Compare the remaining project acreage, construction logistics and the ability to perform management obligations. Avoidance may be practical, but an alternative still needs review against the contract, other title matters and applicable requirements.

With your attorney, address who obtains and pays for the survey and FSA review, what access is permitted before a decision, who maintains the contract area, and the consequences of a changed layout or an unavailable route. Review conditions, deadlines, extensions, termination, payment and restoration in the actual option, sale or lease. If the agreement may be assigned, review its consent requirements and who remains responsible. Do not guarantee an approval or clear construction rights that remain unresolved.

Start a land discussion

Sunland welcomes land sale, lease and existing agreement inquiries from owners and authorized representatives nationwide. Share the property location, approximate acreage, your relationship to it and the conservation contract question. Keep sensitive loan and contract records private until they can be shared securely with the appropriate reviewers.

Depending on the transaction, Sunland may contract with an owner and assign its interest to a specialist, subject to the actual agreement and any required consents. An inquiry or assignment does not itself change the FSA contract or authorize project work.

Questions landowners ask

Does paying off the FSA loan end the conservation contract?

Do not assume so. Review the separate contract and term with FSA and counsel; a mortgage payoff or release is not itself proof of termination.

Can I sell the property during the contract term?

A transfer of title does not end the contract: section 766.110(k) keeps it in effect for its term. Disclose it and have the buyer, FSA, counsel and title company review the obligations.

Can solar panels avoid the protected acres but a cable cross them?

The cable and construction work can still affect the contract area. Include the full route and temporary work in the overlay and obtain FSA’s specific written review.

Can I repay the debt reduction and build?

Do not assume repayment authorizes construction or terminates the agreement. Ask FSA and counsel about the actual contract, proposed activity and available options.

Is this the same as an EQIP practice contract?

No. This guide addresses an FSA conservation contract exchanged for loan debt reduction. Identify each agreement separately because its parties, terms and agency review may differ.

Sources & further reading

The current regulation, FSA fact sheet and handbook guidance were checked November 18, 2026. No individual contract, plan, map or proposal was reviewed. Confirm current requirements and the specific facts with FSA and counsel. Local rules and program details can change. Check the requirements for the actual project.