Landowner guide

Can land near an airport be used for solar?

A private parcel near an airport is not automatically excluded from solar development. The developer needs to assess the actual layout, elevations and equipment against applicable airspace notice requirements and local conditions.

The short answer

Identify the property and nearby airport, then ask the developer for the coordinates, ground elevations and proposed heights of equipment and temporary construction structures. Ask who will check FAA notice criteria, contact the airport and local planning office, and handle any required review before construction.

Describe the site and the proposal

Gather a parcel map, address or coordinates, existing survey if available, and the name of the nearby airport. Tell the developer about known airport-related easements, recorded restrictions or prior correspondence. An aerial map helps identify questions but does not establish the legal boundary or a project’s eligibility.

Request a preliminary layout with panel locations, electrical equipment, fencing, poles and proposed utility routes. Ask the developer to identify the ground elevation and maximum height of proposed structures, including temporary cranes or other construction equipment when known.

Illustration of a land parcel and surrounding landscape

Check whether FAA notice is required

Under 14 CFR 77.9, notice can be required based on a structure’s height or its relationship to certain airports and approach surfaces. The criteria depend on the proposal and airport; proximity alone does not answer the question. Ask the project sponsor to check the regulation and use the FAA Notice Criteria Tool with accurate location and height information.

The FAA identifies Form 7460-1 for notice of proposed construction or alteration and its Obstruction Evaluation Group as the contact for off-airport proposals. If notice is required, ask who will file it and share the resulting FAA determination. Filing notice is not itself a local permit or a guarantee that the project can proceed.

Coordinate separately with local officials and the airport

Ask the local planning office about zoning, permits, airport overlay districts and any local application requirements for the particular parcel. Ask the airport operator whom the developer should contact about the layout, construction and potential visual concerns. Obtain the actual documents governing any airport easement or restriction and have counsel review them.

The FAA’s 2021 solar policy addresses proposed on-airport systems at federally obligated airports with control towers. Do not assume those on-airport procedures automatically govern a private off-airport parcel. The developer should ask the FAA and local authorities what review applies to the actual site.

Want to ask about your land?

Send the location and what you know. You don’t need a project plan.

Tell us about your land

Connect screening to the agreement

Ask the developer to explain who is responsible for aviation screening, any notice or studies, costs and schedule, and what happens if a required review changes the layout. Have independent counsel review an option, lease or sale agreement and any deadlines before signing.

Sunland reviews solar land and existing project opportunities nationwide. Share the property location, approximate acreage if known, your relationship to it and the nearby airport. A submission begins an initial review and does not establish approval or grid capacity.

Questions landowners ask

Is every solar project near an airport prohibited?

No. The location alone does not decide suitability. The project sponsor should check the specific layout and applicable FAA and local requirements.

Who can check the FAA notice criteria?

Ask the project sponsor or its qualified consultant to check the criteria using accurate coordinates, elevations and heights, and contact the FAA Obstruction Evaluation Group for off-airport questions.

Does an FAA filing replace local permits?

No. Ask the local planning authority about separate land-use and permit requirements for the property.

Sources & further reading

Sources checked 2026-11-15. Local rules and program details can change. Check the requirements for the actual project.